My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
05-09-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:16:40 AM
Creation date
5/8/2012 8:37:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DLR Group i KKE <br /> Architecture Engineering Planning Interiors <br /> o:612/977-3500 1 f:612/977-3600 <br /> 520 Nicollet Mail,Suite 200 Minneapolis,MN 55402 <br /> dirgroup.com I listen.DESIGN.deliver <br /> well as by communicating stair and platform lift to level 2. This level also includes a multi-purpose group <br /> exercise studio. Level 3 is completely above grade level. <br /> Level 4 is planned to include (4) standard size (900 sf) classroom spaces, new ADA accessible toilet <br /> facilities and study lounge space. Level 4 is accessed from existing HC building level 4 and the new NE <br /> stairway from Kresge courtyard. <br /> Phase 2 <br /> Level 1 at this time is being planned as building services, general storage space and elevator machine <br /> room. This level is accessed from Kresge courtyard via elevator or through level 1 of Phase 1. Level 1 is <br /> completely below grade level. <br /> Level 2 is planned as the main entry to Phase 2 from Kresge courtyard. At this time level 2 is being <br /> planned as Biokenitics program spaces which will include reception space, staff offices and testing labs. <br /> Also on this level is planned a women's locker room expansion. This level is accessed directly from <br /> Kresge courtyard or from Phase 1. Level 2 will be partially below grade level. <br /> Level 3 is at this time being planned as Health Services and Counseling program spaces which include <br /> reception space, staff offices and consultation rooms. This level is accessed via elevator from level 2 and <br /> from Phase 1. Level 3 is completely above grade level. <br /> Level 4 is planned to include (4) standard size (900 sf) classroom spaces and new ADA accessible toilet <br /> facilities. This level is accessed via elevator from level 2 and from Phase 1. <br /> Please do not hesitate to contact me with any questions, comments or observations regarding this project <br /> description or the enclosed information. <br /> Sincerely, <br /> DLR Group-KKE <br /> cam. ..- <br /> Timothy L. Powers, AIA, LEED AP <br /> Associate <br /> Attachments: Levels 1-4 floor plans, building elevations, preliminary site plan <br /> Minneapolis Chicago Colorado Springs/Denver Des Moines Honolulu Kansas City Los Angeles Modesto <br /> Omaha/Lincoln Orlando Palm Springs Phoenix Portland Riverside Sacramento Seattle Shanghai <br />
The URL can be used to link to this page
Your browser does not support the video tag.