My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, 2013-2017 Capital Improvement Plan (CIP)
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
06-18-12-WS
>
2A, 2013-2017 Capital Improvement Plan (CIP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 12:10:32 AM
Creation date
7/17/2012 12:47:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
berm and the temporary fence in left, and also keep balls that are overthrown from <br /> third in play versus going into the parking lot. <br /> 3. Off Leash Dog Area (2013) - $7,500 <br /> The PTRC has a 2012 goal of researching and reviewing the potential for an off <br /> leash dog area in the City. No site has been determined yet and the PTRC is still <br /> working on locations and details to bring to the Council. This is a place holder. <br /> If a hockey rink is determined to be a potential location, this amount would be <br /> greatly reduced, as fencing needs would be reduced. This number is based on <br /> adding fencing/outdoor bathroom/amenities (including signs). <br /> 4. County Road E Improvements between Highway 51 and Lexington Avenue <br /> (2013)—$229,740 <br /> The City signed a contract for $48,260 with Bolton & Menk in 2012 for Phase I <br /> of the B-2 Implementation Plan. Of the total planned expenditure of$278,000 for <br /> planning and design, $229,740 was moved to 2013. Funding sources were <br /> adjusted proportionally. <br /> The project description was simplified. The list of preliminary improvements <br /> proposed by the B-2 Guiding Plan was removed since the current implementation <br /> planning process will determine actual improvements. <br /> 5. Gateway Signs (2013)—$50,000 <br /> The project description has been updated. A sign cost of $25,000 per sign was <br /> previously estimated. Given the current quotes for the Lexington/Co Rd E sign, <br /> the sign cost estimate was kept at $25,000 per sign, but it is now noted that the <br /> cost includes installation, lighting, and landscaping. <br /> Previously, three signs were assumed to be installed in 2012. The sign at <br /> Lexington/Co Rd E will be installed prior to the completion of the Walgreens <br /> development. The estimated cost, including installation, lighting, landscaping and <br /> cost participation by the developer, is $15,000. Staff recommends that this sign <br /> be installed so that the Council can see how it looks prior to the approval of any <br /> additional signs. Signs at County Road D/Lake Johanna Blvd and Hwy <br /> 96/Lexington are programmed for 2013. Both 2013 signs will likely need <br /> landscaping plans to be approved in late 2012/early 2013. <br /> The source of funds for this project was previously identified as the EDA <br /> Revolving Fund. A transfer from the General Fund will be necessary. <br /> 6. Communications Equipment(2013) - $15,000 <br /> In 2011, rather than investing approximately $16,000 on a new bulletin system, <br /> the City entered into a lease for a bulletin system with CTV for $1,800 annually. <br /> The CTV lease is not a capital expenditure and was reflected in the approved <br /> 2012 budget. <br /> City Council Meeting <br /> P:\Finance\Finance Director\2013 Budget\CIP\2013 CIP Preliminary-Memo.docx <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.