Laserfiche WebLink
V. Item 12-EgpV-002 Replace 1997 Dump Truck w/Plow/Wing Plow/Sander <br /> was moved from 2013 to 2014. Due to the limited use in the snow season of <br /> 2011/2012 should be able to extend its useful life by another year. <br /> vi. Item 12-Eqp-006 Replace 1996 Roller was moved from 2013 to 2014. This <br /> piece of equipment is still operating fine and may be extended even further in <br /> the future. <br /> vii. Item 13-Eqp-003 Replace 2002 Groundsmaster with Snow Blower was moved <br /> from 2013 to 2014. This piece of equipment is primarily used for snow <br /> removal on ice rinks, due to the limited use in the 2011/2012 season it can be <br /> extended another year. <br /> viii. Item 16-Eqp-001 Large Area Mower has been moved from 2016 to 2015. This <br /> is the only large area mower in our fleet, it is a 1999 model and is out almost <br /> daily during the grass cutting season. <br /> ix. An item has been added to 2017 to replace the two 2011 Toro Z mowers. <br /> These two mowers together with the large area mower are the workhorses of <br /> the grass cutting fleet. It is important to have them in very good condition <br /> because if they are down for repairs for just a few days grass cutting falls <br /> behind. ' <br /> X. Added replacement of the 2004 Hotbox (unit 112) in 2016. This unit is used <br /> for bituminous patching. It is a 2004 and the replacement cost is $20,000. <br /> xi. Added an item to replace 2001 Toro Workman(Unit 411) in 2016 <br /> 13. Springbrook Software Upgrades (2013)— 13,000 <br /> The Springbrook Business analytical and dashboards have not been purchased. <br /> The 13,000 that was presented in the 2012 CIP will be moved to the 2013 CIP for <br /> the purchase of these upgrades. <br /> 14. Plotter 2013—$10,000 <br /> The City is unable to print large maps or signs in house. All large print materials <br /> need to be printed by Roseville or another company. The plotter is a place holder <br /> for an estimated cost. Staff have received quotes for a plotter that range from <br /> $6,000 to $10,000. <br /> City Council Meeting <br /> P:\Finance\Finance Director\2013 Budget\CIP\2013 CIP Preliminary-Memo.docx <br /> Page 5 of 6 <br />