My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, 2013-2017 Capital Improvement Plan (CIP)
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
06-18-12-WS
>
2A, 2013-2017 Capital Improvement Plan (CIP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 12:10:32 AM
Creation date
7/17/2012 12:47:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the cost. Due to some procurement problems at Xcel Energy the project was <br /> pushed back to 2013. <br /> ii. Eliminated 09-Storm-002 Erosion Correction of Old City Hall Trail for <br /> $20,000. This project was never undertaken and now the need for it has been <br /> removed by the Pulte Fox Ridge development. <br /> iii. Added an item to fund$25,000 of repairs of inlets/outlets in the City's storm <br /> drainage system. The inlets/outlets were all inspected in 2011 and many were <br /> found to need repair. This CIP item will allow the City to take on a few of <br /> these type repairs each year. <br /> 11. Street Department <br /> i. Moved funding for 12-Str-007 Snelling Avenue PMP from 2012 to 2013 <br /> based on the Council decision to rebuild the street and bridge in the same <br /> year. 2013 is the earliest year both could be accomplished. Will continue to <br /> monitor this item as it may be pushed further back it the CIP <br /> ii. Added 17-Str-XXX 2017 Crackseal and Sealcoat <br /> iii. Added 14-Str-XXX Ramsey County Lexington Avenue Improvement(I-694 <br /> to Co. Rd. F). This project is programmed by Ramsey County for 20t4. It is a <br /> $2.0+ Million project. The City will likely have a minor cost participation. For <br /> now a$100,000 placeholder has been put in the CIP until a firm amount is <br /> determined. <br /> 12. Equipment <br /> i. Item 11-EgpV-004 Replace Jetter and Vactor Truck with Combo Machine has <br /> had the expenditure of$300,000 moved from 2012 to 2013. Even if this piece <br /> of equipment were to be ordered in late 2012 the delivery time would put the <br /> payment into 2013. <br /> ii. Item 13-Eqp-004 Replace 1997 Street Sweeper scheduled for 2015 has had <br /> the total price raised from $150,000 to $200,000 to reflect the actual price of <br /> the equipment. <br /> iii. Added in 2017 the replacement of Unit 401 a 2005 4-door diesel pickup truck <br /> for$50,000 minus trade in value. <br /> iv. Added in 2014 the updating of the camera and controls on the existing <br /> sanitary sewer televising trailer. The system is a 2003 and this update should <br /> extend the useful life of the system another 15 years. <br /> City Council Meeting <br /> P:\Finance\Finance Director\2013 Budget\CIP\2013 CIP Preliminary-Memo.docx <br /> Page 4 of 6 <br />