My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Approval of Arden Hills Gateway Sign
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
07-30-12-R
>
8A, Approval of Arden Hills Gateway Sign
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:25:03 AM
Creation date
7/30/2012 9:31:16 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />�^i�EN HILLS <br />MEMORANDUM <br />DATE: July 30, 2012 <br />TO: Honorable Mayor and City Councilmembers <br />FROM: Meagan Beekman, City Planner <br />SUBJECT: Gateway Signs <br />Requested Action <br />Select one of the four options provided for the design of gateway sign. <br />Motion to award the quote by Fourth Dimension for the selected sign design in an amount not to <br />exceed $10,100 plus applicable taxes for the cost of the sign and installation. <br />Back�round <br />The City Council and the Economic Development Commission have been working on Gateway <br />Signs for several years. The installation of gateway signs is a Council goal for 2012. The 2012- <br />2016 CIP identifies $140,000 over three years for installation of six gateway signs. In 2012, the <br />CIP designates $65,000 for gateway sign installation which assumes two signs at a cost of <br />$25,000 each and a sign at Arden Plaza for a cost of $15,000 (the developer has agreed to pay for <br />the sign base). The estimated cost also includes lighting and landscaping for each sign. <br />At the May 21, 2012, work session, the Council reviewed the sign locations suggested by the <br />Economic Development Committee, and provided direction to Staff on preferred design elements <br />for the gateway sign. The Council also directed Staff to move forward with obtaining a proposed <br />design and quote for a sign which would be located at Arden Plaza at the intersection of <br />Lexington Avenue and County Road E. The Council's consensus was to focus on completing <br />one sign at this location, and then working towards a possible second sign for the triangle parcel <br />at County Road D and Lake Johanna Boulevard. <br />At the July 16, 2012, work session the Council reviewed a final design based on their discussions <br />from previous meetings and directed Staff to bring the sign, along with a few slight variations, to <br />the Council for final approval and award of the project bid. <br />City ofArden Hills <br />July 30, 2012, City Council Meeting <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.