My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Approval of Arden Hills Gateway Sign
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
07-30-12-R
>
8A, Approval of Arden Hills Gateway Sign
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:25:03 AM
Creation date
7/30/2012 9:31:16 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sign Options <br />Fourth Dimension has prepared four options, which are all variations on the selected sign design <br />which was reviewed at the July 16, 2012, meeting. The sign options are all the same price. <br />Option #1— The original design shown to the Council on July 16, 2012 <br />Option #2 — A vaxiation of the original which has the tree on the logo slightly off center. <br />This option also includes a mock up of what the back of the sign would look like with the <br />City name and logo and without. <br />Option #3 — A slight variation on the original design that keeps the logo centered, but has <br />the curve of the bottom of the sign mirrored at the top of the sign <br />Option #4 — A slight variation on sign Option #3, which reverses the curve at the top <br />It should be noted that the sign that is proposed would be single-sided and would not have the <br />City name and logo on the back. However, the sign face material would wrap all around the <br />sign, including n the back facing Arden Plaza. <br />Sign Estimate <br />Fourth Dimension quoted $10,100 plus any applicable taxes for any of the attached design <br />options. The sign estimate includes construction and installation of the selected sign option. The <br />estimate also includes single-sided lighting at the base of the sign. The sign estimate does not <br />include the electrical wiring for the lighting or the landscaping around the sign base. The cost of <br />wiring and landscaping may be brought back to the Council depending on the final estimated <br />costs of these items. <br />The Arden Plaza development agreement includes a commitment from Arden Plaza to construct <br />or pay for the base of this sign; however, because of how the sign is designed and constructed <br />separating the cost of the base from the cost of the face is challenging. Staff and Arden Plaza <br />have discussed this, and Arden Plaza has agreed to simply pay for half of the cost of the sign <br />with installation, which would be $5,050. <br />Attachments <br />A. Quote from Fourth Dimension <br />B. Proposed Sign Design Options 1-4 from Fourth Dimension <br />City ofArden Hills <br />July 30, 2012, Work Session Meeting <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.