Laserfiche WebLink
Exhibit A <br /> Conditions for Municipal Consent of US 10/Hwy 96 Final Layout <br /> September 26, 2011 <br /> 1. Mn/DOT is currently undertaking an improvement to 1-694 at TH51. This project will have <br /> the bridge over 1-694 from Hamline Avenue to TH51 (Snelling Avenue) closed for most of <br /> the next two years. Mn/DOT is also planning to let a contract to widen the Lexington <br /> Avenue Bridge. Although this work will be completed under traffic, it will have an effect on <br /> the flow of traffic across the bridge. Therefore, to maintain some minimal mobility for local <br /> traffic to move north to south, Highway 96 shall not be closed in the same year that the <br /> Lexington Avenue Bridge widening is completed. <br /> 2. Ramsey County and/or Mn/DOT shall re-evaluate the noise analysis work completed for the <br /> southwest quadrant of US 10 and Highway 96 to determine if a different length noise wall <br /> and/or a different height noise wall would meet the criteria for cost effectiveness. <br /> 3. The Concrete Barrier Type F planned to be installed adjacent to Lakeshore Place as part of <br /> the improvement shall be increased in height to the tallest Type F barrier that can be slip- <br /> formed in this location. <br /> 4. Ramsey County shall make every effort short of utilizing eminent domain procedures to <br /> realign the west end of the noise wall on the north side of Highway 96 so it is in the <br /> appropriate location to facilitate a further extension with future highway improvements. <br />