Laserfiche WebLink
0 <br /> • Perform a wetland boundary and type delineation <br /> • Survey the delineated wetland boundaries <br /> • Survey the noted wetland plant communities <br /> • Prepare a drawing showing the wetland and plant communities on different layers of a CAD <br /> drawing in the City's preferred format. <br /> • Prepare a summary wetland report describing the wetland boundaries,current weather conditions, <br /> report wetland functions and values,pristine and invasive wetland plant communities and <br /> enhancement opportunities. <br /> • Submit the draft report to City Staff <br /> • Submit the approved report to the Wetland LGU and Technical Evaluation Panel(TEP). <br /> Project Schedule <br /> Survey work would begin on August 28,after the contract is awarded August 27,and proceed <br /> approximately as follows: <br /> • Week of August 27 <br /> o A Gopher State One Call request for utility maps will be made on August 28 <br /> o A Gopher State One Call request for utility markings will be made <br /> • Owner and encumbrance(O&E)report will be ordered for the Johanna Marsh parcel <br /> and its unplatted adjoining parcels <br /> • Horizontal control points will be established and level loops will be run through the <br /> control points from Ramsey County bench marks in the area. <br /> • A copy of the plat in which the project resides will be acquired <br /> • An initial Base Map will be prepared <br /> ■ Property corner search coordinates will be established for use by the survey <br /> crew(s) <br /> • Compile background information and existing mapping <br /> • Week of September 3 <br /> • At least one survey crew will begin work on the topographic survey <br /> • One crew will begin work on the boundary survey <br /> • A Certified Wetland Delineator will perform a field delineation,MnRAM functions and <br /> Values assessment and plant communities survey <br /> ■ Sub-foot GPS locations will be taken for the delineated wetland boundaries <br /> ■ Sub-foot GPS locations will be taken for the various plant communities <br /> Downloading GPS and MnRAM Data <br /> • Downloading GPS and MnRAM Data <br /> • Preparing and submitting a Draft Delineation,Functions and Values, and <br /> Recommendations Report to City Staff <br /> • Week of September 10 <br /> • Topographic surveys will continue <br /> • Field survey of the Johanna Marsh parcel boundary will be complete <br /> • Incorporating Staff comments <br /> • With Staff approval,submitting the Final Report to the TEP <br /> • TEP meeting <br /> N:\PROPOSALS\$Survey\Burnsville\2012\Togo\Arden Hills 2013\Arden Hills 2013 PMP.doe <br />