Laserfiche WebLink
z�`v <br /> �e <br /> O��HNESp�q� t -v <br /> it <br /> 1-35W North Managed Lanes Corridor Study <br /> Study Overview - June 2012 <br /> 06.14.2 0 12 <br /> Corridor Summary <br /> The I-35W North Managed Lanes Corridor Study extends from downtown Minneapolis to Forest Lake.The purpose of the <br /> study is to identify preferred managed lane concepts as well as improvement strategies at spot locations along the corridor. <br /> A Technical Advisory Committee,consisting of local,county,state,and federal representatives,meets every other month to <br /> provide recommendations and feedback on the study process. <br /> Managed Lanes Corridor Alternatives _ Traffic Forecast Update <br /> Corridor alternatives have been developed that identify different ways to Traffic forecasts are is being developed <br /> construct an additional managed lane within the I-35W corridor.Previously for the I-35W North Managed Lanes <br /> identified corridor segments may end up utilizing different alternatives.The Corridor Study in order to identify <br /> corridor alternatives include: future(2030)traffic demand. <br /> • No Build Alternative <br /> • Alternative 1 -Managed Lane within Existing Pavement Width BRT Evaluation Update <br /> • Alternative 2 -Bus Only Shoulder A Bus Rapid Transit(BRT)Evaluation <br /> • Alternative 3A-Managed Lane with Full Shoulder is being completed for the study <br /> • Alternative 3B-Managed Lane with Minimal Shoulder in order to understand future BRT <br /> • Alternative 4A-Single Reversible Managed Lane ridership demand.Additional forecasts <br /> • Alternative 4B-Two Reversible Managed Lanes are being completed to determine <br /> future ridership with cost-constrained <br /> Primary Screening Analysis BRT assumptions. <br /> A primary screening analysis for the corridor study has been completed.The <br /> purpose of the primary screening is to narrow down corridor alternatives <br /> at each of the five corridor segments by analyzing how well each corridor For more information please visit: <br /> alternative supports the project goals.Based on the primary screening www.dot.state.mn.us/metro/projects/ <br /> analysis,the following corridor alternatives will be carried forward to i35wstudy <br /> secondary screening: Bill Goff <br /> • Segment 1 (3rd/4th Street to Johnson Street)-Carry forward Alternative 1, Minnesota Department of Transportation <br /> Metro Division-Waters Edge <br /> 3A,and 3B 1500 West County Road B-2 <br /> • Segment 2(Johnson Street to TH 36)-Carry forward Alternative 1 and 3B Roseville,MN 44113 <br /> 651.234.7797 <br /> • Segment 3(TH 36 to I-694)-Carry forward Alternative 3A and 3B William.goff @state.mn.us <br /> • Segment 4(1-694 to TH 10 North)-Carry forward Alternative 3A and 3B Todd Polum <br /> • Segment 5A*(TH 10 North to TBD)-Carry forward Alternative 3A and 3B SRF Consulting Group,Inc. <br /> • Segment 5B*(TBD to TH 97)-Carry forward No Build Alternative One Carlson Parkway,Suite 150 <br /> Plymouth,MN 55447 <br /> Note that Segment 5 is split into two segments. The exact transition point 763.475.0010 <br /> between Segment 5A and Segment 5B will be determined during secondary tpolum@srfconsulting.com <br /> screening. <br />