My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B, Planning Case 12-009 - 1201 County Road E Reuse Proposal
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
05-14-12-R
>
8B, Planning Case 12-009 - 1201 County Road E Reuse Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:21:16 AM
Creation date
9/28/2012 1:52:55 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Introduction and Summary <br />a. Purpose of Report and Study Objectives <br />The City of Arden Hills is developing a Guiding Plan for the B2 <br />District. The purpose of this report is to determine if existing <br />transportation infrastructure can accommodate the redevelopment <br />contemplated in the Guiding Plan and to recommend changes to the <br />transportation infrastructure to enhance the redevelopment. <br />The study objectives are: <br />i. Determine how the existing County Road E/Hamline Avenue <br />West Ramp, County Road E/Connelly Avenue, County Road <br />E/Pine Tree Drive, County Road E/Holiday Inn Site Driveway, <br />County Road E/Arden Plaza Driveway, County Road <br />E/Lexington Avenue, and Lexington Avenue/Harriet Avenue <br />intersections currently operate. <br />ii. Determine if the above intersections will operate acceptably <br />after the redevelopment is fully occupied in 2030. <br />iii. Recommend improvements if needed. <br />b. Executive Summary <br />The City of Arden Hills is planning for redevelopment along the <br />County Road E corridor. The redevelopment is planned to occur on <br />three different sites along the corridor: (1) the Pot `O Gold bingo hall <br />site will be replaced with 15,000 square feet of offices, (2) the Holiday <br />Inn hotel will be replaced with 95 apartment units and 120,000 <br />square feet of office, and (3) the 46,000 square feet of offices on the <br />Arden Plaza site will be replaced with a 14,400 square foot pharmacy <br />and 5,000 square foot shopping center. <br />To determine if there will be significant traffic impacts to the County <br />Road E corridor, the following intersections are analyzed in this <br />study: <br />• County Road E& Hamline Avenue West Ramp <br />• County Road E& Hamline Avenue East Ramp/Connelly <br />Avenue <br />• County Road E& Pine Tree Drive <br />• County Road E& Holiday Inn Site Driveway <br />• County Road E& Arden Plaza Driveway <br />• County Road E& Lexington Avenue <br />• Lexington Avenue & Harriet Avenue <br />Guiding Plan for the B2 District 1 Arden Hills, MN <br />Traffic Impact Study December 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.