My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-12 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2012
>
10-16-12 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:10:39 AM
Creation date
10/11/2012 3:48:04 PM
Metadata
Fields
Template:
General
Document
10-16-12 PTRC Packet
General - Type
10-16-12 PTRC Packet
Category
10-16-12 PTRC Packet
Date
10/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks,Trails,&Recreation Committee Meeting Minutes September 25,2012 <br /> Page 5 <br /> D. Trail Signage Update <br /> Ms. Olson indicated the trail signage final designs were delayed in order to receive the <br /> 694 configuration from Mn/Dot, as she wanted to make sure it was correct on the map. <br /> She has also inspected the areas that were selected for sign placement to make sure the <br /> signs can be placed at those areas. Ms. Olson mentioned the maps will be finalized <br /> within the next week. We are hoping to have installation completed some time in <br /> October. <br /> E. Other Unfinished Business <br /> None <br /> 5. NEW BUSINESS <br /> A. Buckthorn Removal/Clean Up Day <br /> Ms. Olson recapped that last year they took a year off from buckthorn removal and did <br /> garden clean up instead. She has, however, had a lot of interest from the Karth Lake, <br /> Cummings and Hazelnut neighborhoods on doing the buckhorn removal once again and <br /> feels they can get a number of volunteers. Ms. Olson indicated the date that had been set <br /> aside was the 27th of October. She is looking for direction from the committee on <br /> whether they would like to do the buckthorn removal, and if so, at which park and on <br /> what date. <br /> Committee Member Messerly indicated that buckthorn either needed to be removed by <br /> the root or if cutting, each stump needed to be treated in order to avoid spreading. Ms. <br /> Olson indicated they do try to treat which they did not do back when they did Crepeau. <br /> Discussion ensued regarding the buckthorn removal and it was the consensus of the <br /> committee to hold the Buckthorn removal on October 27 at Hazelnut Park, since it had <br /> the most neighborhood support. Ms. Olson indicated that as in the past they will meet at <br /> 9:00 on October 27th and she will send a reminder note to the members as well as a letter <br /> to the neighbors around the park. She also asked that since the City has a limited amount <br /> of tools that the members bring as many tools as possible (saws,root pullers). <br /> Council Liaison Holden requested that the Boy Scouts also receive notification about the <br /> buckthorn removal project. <br /> B. Other New Business <br /> None <br /> ADJOURNMENT <br /> MOTION: Committee Member Scott moved to adjourn, seconded by Committee Member <br /> Kramlinger. The motion carried unanimously (8-0). <br /> NEXT MEETING <br /> The next meeting is scheduled for October 16, 2012 at 6:30 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.