Laserfiche WebLink
CHANGE ORDER#2 <br /> (Attachment) <br /> This contract is amended as follows: <br /> WHEREAS: After construction of the rain water garden the drawdown time experienced after <br /> a storm event was slower than desired; and <br /> WHEREAS: Soil testing completed determined that the select granular borrow used for the <br /> rain water garden construction met mechanical sieve analysis requirements; and <br /> WHEREAS: Geotechnical recommendations based on the soil testing was to construct rock <br /> bedding around the draintile to increase the filtration rate; and <br /> WHEREAS: The Engineer directed the Contractor to complete as part of this project. <br /> NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br /> 1. The Contractor shall complete the above described changes and additions to the project. <br /> 2. Payment for the work was reviewed and approved by the Engineer. <br /> 3. The Contractor will not make claim of any kind or character for any other costs or <br /> expenses that he may have incurred or that he may hereafter incur in performing the <br /> work or furnishing the materials of this agreement. <br />