Laserfiche WebLink
CHANGE ORDER#2 COST SUMMARY <br /> PROJECT: VALENTINE PARK IMPROVEMENTS <br /> OWNER. CITY OF ARDEN HILLS <br /> ITEM ITEM DESCRIPTION <br /> NO. UNIT QTY UNIT PRICE TOTAL PRICE <br /> CHANGE ORDER#2 <br /> 1 2105.604 DRAINTILE FABRIC SY 562.20 $0.62 $348.56 <br /> 2 2451.607 PIPE BEDDING MATERIAL CY 81.90 $27.00 $2,211.41 <br /> 3 2502.541 4"PERF PE PIPEDRAIN W/SOCK LF 270.00 $0.60 $162.00 <br /> 4 SPEC PUMPING LS 1.00 $196.04 $196.04 <br /> 5 SPEC LABOR HR 37.32 $78.52 $2,930.37 <br /> 6 SPEC EQUIPMENT HR 9.33 $230.00 $2,145.90 <br /> 7 SPEC SOIL TESTING LS 1,087.50 $1.00 $1,087.50 <br /> CHANGE ORDER#2--SUBTOTAL $9,081.78 <br /> TOTAL $9,081.78 <br /> CO#2 <br />