My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5B, Valentine Park Improvement Project - Approve Change Order #2 and Pay Estimate #3 in the Amount of $18,617.74
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
11-26-12-R
>
5B, Valentine Park Improvement Project - Approve Change Order #2 and Pay Estimate #3 in the Amount of $18,617.74
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2012 12:17:38 PM
Creation date
11/20/2012 12:17:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAY ESTIMATE#3 <br /> FROM:July 7,2012 <br /> TO:October 25,2012 <br /> CONTRACTOR:INTERSTATE PAVEMENT MAINTENANCE <br /> ADDRESS:PO BOX 1028,FOREST LAKE,MN 55025 <br /> OWNER:CITY OF ARDEN HILLS <br /> PROJECT:VALENTINE PARK IMPROVEMENTS <br /> SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL:June 29,2012 ORIGINAL: $ 321,757.00 <br /> REVISED: REVISED: $ 327,823.93 <br /> S:ii�3R3 '<L.OAb CT:iS:::::::S:i:;:S::;:; f)D ::%i:::i;:::i<:5::^i:::S:Si::: <br /> . ... ...::::.;:;:; r:: :: GBYAL. TRA..... ...................TFg3:PER1 <br /> OEM :::::: ::.......... .:::::::::::::::::::.::: ::::::.::.:::::::::::::..:: :::::::::::: .... TfkT1Ci .................. <br /> :>s;:;:;>:>::::LTEMiIIE$CR3PTJbPE:i:ii: z::;::::;::ia:i: s;:;;::::-'.;:::;sra:i::U1QF€>i Ii'iiQT3f ;:...... T.PRICE:':3::iii:`: E T.Y. s i:i3::=:>TOTAI#'RtCE:ii;...............: QF3[` i..?.........t A .. E.. <br /> NG,. .............. <br /> SCHEDULE 1.0.VALENTINE PARK <br /> L 3 1 44 <br /> 2021.501 MOBILIZATION LS 1.00 50547.25 0.00 $0.00 0.63 $31,8 .77 <br /> 2 2101.502 CLEARING TREE 22.00 195.00 0.00 $0.00 22.00 $4290.00 <br /> 2101.507 GRUBBING TREE 22.00 50.00 0.00 $0.00 21.00 $1,050. <br /> 4 2104.501 REMOVE SEWER PIPE SANITARY LF 265.00 14.00 0.00 $0.00 265.00 $3,710. <br /> 5 2104.501 REMOVE SEWER PIPE STORM LF I 60.00 18.00 0.00 $0.00 60.00 $1,080.00 <br /> 6 2104.501 REMOVE CONCRETE CURB AND GUTTER LF 125.00 4.50 0.00 $0.00 0.00 $0.00 <br /> 7 2104.501 REMOVE FENCE LF 335.00 2.25 0.00 $0.00 320.00 $720.00 <br /> 8 2104.505 REMOVE CONCRETE PAVEMENT SY 100.00 2.00 0.00 $0.00 100.00 $200.00 <br /> 9 2104.505 REMOVE BITUMINOUS PAVEMENT SY 1,460.00 2.20 0.00 $0.00 1,460.00 $3212.00 <br /> 10 2104.509 REMOVE SANITARY MANHOLE EACH 1.00 980.00 0.00 $0.00 1.00 $980.00 <br /> 11 2104.509 REMOVE SANITARY CASTING EACH 3.00 70.00 0.00 $0.00 3.00 $210.00 <br /> 12 2104.509 REMOVE BENCH EACH 2.00 10O.D01 0.00 $0.00 0.00 $0.00 <br /> 13 2104.509 REMOVE LIGHTPOLE EACH 2.00 600.00 0.00 $0.00 2.D0 $1,200.0 <br /> 14 2104.509 REMOVE BASKETBALL HOOP EACH 1.00 85.00 0.00 $0.00 1.00 $85.00 <br /> 15 2104.509 REMOVE SIGN EACH 2.00 75.00 0.00 $0.00 2.00 $150.00 <br /> 16 2104.509 REMOVE PARKING STOP EACH 17.00 25.00 0.00 $0.00 17.00 $425.00 <br /> 17 2104.511 SAW CUT CONCRETE FULL DEPTH LF 14.00 8.D0 0.00 $0.00 0.00 $0.00 <br /> 18 2104.513 SAW CUT BITUMINOUS FULL DEPTH LF 150.00 5.00 0.00 $0.00 0.00 $0.00 <br /> 19 2104.523 SALVAGE SIGN EACH 2.00 110.00 0.00 $0.00 2.00 $220.00 <br /> 20 2104.523 SALVAGE HYDRANT EACH 1.00 1,290.00 0.00 $0.00 0.D0 $0.00 <br /> 21 2105.501 COMMON EXCAVATION P CY 3289.00 9.50 0.00 $0.00 3,189.00 $30,295.5 <br /> 22 2105.522 SELECT GRANULAR BORROW C PARKING LOT CY 550.00 11.35 0.00 $0.00 738.00 $8,376. <br /> 23 2105.522 SELECT GRANULAR BORROW C BASKETBALL COURT CY 145.00 10.00 0.00 $0.00 165.00 $1,650.00 <br /> 24 2105.522 SELECT GRANULAR BORROW C RAIN WATER GARDEN CY 670.00 1025 0.00 $0.00 646.56 $6,627.2 <br /> 25 2105.522 SELECT GRANULAR BORROW C PLAY AREA CY 180.00 10.001 0.00 $0.00 120.00 $1,200.00 <br /> 26 2105.525 TOPSOIL BORROW C CY 750.00 15.00 0.00 $0.00 0.00 $0.00 <br /> 27 2105.604 GEOTEXTILE FABRIC PE SY 2,450.00 0.85 0.00 $0.00 2 200.00 $1,870.00 <br /> 28 2105.604 GEOGRID PE TX130S SY 2,520.00 2.20 0.00 $0.00 2,520.00 $5,544.00 <br /> 29 2211.501 AGGREGATE BASE CLASS 5 PARKING LOT TON 450.00 16.00 0.00 $0.00 283.70 $4,539.20 <br /> 30 2211.501 AGGREGATE BASE CLASS 5 BASKETBALL COURT TON 115.00 16.001 0.00 $0.00 115.00 $1,B40. <br /> 31 2211.501 AGGREGATE BASE CLASS 5 SIDEWALK TON 240.00 16.00 0.00 $0.00 240.00 $3,840. <br /> 32 2211.501 AGGREGATE BASE CLASS 5 RAIL TON 275.00 16.00 0.00 $0.00 100.00 $1,500.0 <br /> 33 2231.604 BITUMINOUS PATCH SPECIAL SY 30.00 38.00 0.00 $0.00 0.00 $0.00 <br /> 34 2232.501 MILL BITUMINOUS PAVEMENT SY 35.00 8.D0 0.00 $0.00 0.00 $0.00 <br /> 35 2350.501 TYPE MV4 WEAR COURSE MIXTURE PARKING LOT TON 75.00 86.00 0.00 $0.00 0.00 $0.00 <br /> 36 2350.501 TYPE MV4 WEAR COURSE MIXTURE BASKETBALL COURT TON 25.00 86.00 0.00 $0.00 0.00 $0.00 <br /> 37 2350.501 TYPE MV4 WEAR COURSE MIXTURE RAIL TON 50.00 75.00 0.00 $0.00 0.00 $0.00 <br /> 38 2350.502 TYPE LV3 NON WEARING COURSE MIXTURE(BASE) PARKI TON 75.00 86.00 0.00 $0.00 0.00 <br /> 39 2350.502 TYPE LV3 NON WEARING COURSE MIXTURE(BASE)(BEALL TON 25.00 86.00 0.00 $0.00 0.00 $0.00 <br /> 40 2401.601 HELICAL PIER SYSTEM LS 1.00 6,500.001 0.00 $0.00 0.00 $0.00 <br /> 41 2411.507 INSTALL 24"SURGE BASIN EACH 1.00 2,100.00 0.00 $0.00 1.00 �$2100.00 RIAL CY 120.00 27.00 0.00 $0.00 120.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.