My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
11-28-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 12:22:27 AM
Creation date
11/30/2012 3:52:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
implementation of the Guiding Plan, since the building itself impedes the installation of the <br /> new stop light. Furthermore, the existing driveways are not ideally located to address the <br /> broader traffic issues identified by the Guiding Plan. The existing building is presently <br /> situated in a way that allows the building to front on County Road E, with the majority of <br /> parking behind, which is in keeping with the goals of the Guiding Plan; however,the primary <br /> entrance will be located in the rear of the building, which is contrary to the desire to bring <br /> front entrances to County Road E. <br /> Multiple-family housing has been identified as an appropriate use in the B-2 District, through <br /> a CUP or PUD process, and the incorporation of 20,000 square feet of retail space is in <br /> alignment with the Guiding Plan's goal of mixed use. It is likely that the residents of the <br /> redevelopment will be able to frequent nearby businesses without the use of motorized <br /> vehicles. <br /> 3. Signage <br /> The applicant has not submitted a signage plan for the property. All signage on the site will <br /> be required to meet the standards of the City Code. <br /> 4. Traffic <br /> Traffic Study <br /> The City contracted with SRF Consulting to conduct a traffic study. At the time of this <br /> writing, the traffic study had not yet been completed; however, a draft traffic study has been <br /> provided to staff. <br /> The draft study assumed a 10% multi-use trip reduction to account for residents utilizing <br /> nearby businesses; however no trip reduction was assumed for pass-by or multi-modal trips, <br /> though it can be assumed that some will exist. The study also assumed approximately 200 <br /> residents living in the building. <br /> The draft study found that the previous hotel use generated 1,266 trips per day; and that the <br /> proposed apartment use, with retail, would generate 1,364 trips per day. The change in use <br /> would account for 98 additional trips generated to and from the site over a 24-hour period. <br /> The traffic engineer concluded that this was a nominal amount that would not have a <br /> negative impact on the mobility along County Road E or Lexington Avenue. <br /> Additional analysis is being done to look at the internal circulation of the site, to account for <br /> a possible shared access to the west, and possible traffic impacts of a future development if <br /> City of Arden Hills <br /> Planning Commission Special Meeting for November 28, 2012 <br /> P:Wlanning0anning Cases120M2-019-1201 County Road E-PUD MAster and Final PlanU I-28-12-PC Report-1201 County Road E <br /> PUD.docx <br /> Page 11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.