Laserfiche WebLink
CR E IMPROVEMENTS COST ESTIMATE <br /> ARDEN HILLS,MN <br /> CR E MEDIANS(CONNELLY ST&PINE TREE DR) <br /> 810 ITEM UNIT CITY UNIT COST TOTAL COST <br /> REMOVE BITUMINOUS PAVEMENT SY 105 $2.83 $297 <br /> REMOVE CONCRETE MEDIAN SY 263 $4.92 $1,296 <br /> REMOVE CURB&GUTTER LF 135 $3.60 $486 <br /> REMOVE CONCRETE DRIVEWAY PAVEMENT SY 26 $10,00 $257 <br /> BITUMINOUS PATCH SPECIAL SY 124 $26.68 $3,320 <br /> CONCRETE MEDIAN sy 1 205 1 $27-05 $5,551 <br /> CONCRETE CURB AND GUTTER LF 1 942 1 $14.00 $13,188 <br /> B"CONCRETE DRIVEWAY PAVEMENT SY 1 26 1 $50-00 $1,283 <br /> TURF WORK L SUM 1 $4,000.00 $4,000 <br /> TRAFFIC CONTROL AND STAGING L SUM 1 $5,000-00 $5,000 <br /> SUB TOTAL $34,678 <br /> +15%CONTINGENCY $5,202 <br /> +2S%ENGINEERING $9,970 <br /> TOTAL� $49,851 <br /> CR E SEALCOAT AND STRIPING <br /> BID ITEM UNIT CITY UNIT COST TOTAL COST <br /> REMOVE CONCRETE DRIVEWAY PAVEMENT SY 311 $10.00 $3,108.89 <br /> SEALCOAT SY 12,105 $1.75 $21,184 <br /> 8"CONCRETE DRIVEWAY PAVEMENT SY 311 $50.00 $15,544 <br /> PAVT MSSG(LT/RT ARROW)EPDXY EACH 14 $125.00 $1,750 <br /> PAVT MSSG(ONLY)EPDXY EACH 1 $300-00 $300 <br /> 4"SOLID LINE WHITE-EPDXY LF 3,225 $0.25 $806 <br /> 4"BROKEN LINE WHITE-EPDXY LF 562 $0.25 $141 <br /> 24"SOLID YELLOW-EPDXY LF 483 $5.75 $2,777 <br /> 4"SOLID LINE YELLOW-EPDXY LF 1,443 $0.25 $361 <br /> 4"DOUBLE SOLID LINE YELLOW-EPDXY LF 991 $0,50 $496 <br /> 14"BROKEN LINE YELLOW-EPDXY LF 254 $0.25 $64 <br /> ICROSSWALK MARKING-EPDXY SF 666 $5.81 $3,869 <br /> ITRAFFIC CONTROL AND STAGING LSUM 1 $5,000.00 $5,000 <br /> SUB TOTAL $55,400 <br /> +15%CONTINGENCY $8,311 <br /> +25%ENGINEERING $15,928 <br /> TOTAL $79,640 <br /> CR E CORRIDOR DECORATIVE LIGHTING <br /> BID ITEM UNIT CITY I UNIT COST TOTAL COST <br /> LIGHTING SYSTEM L SUM 0.44 1$540,000.00 $237,045 <br /> LIGHTING REMOVAL LSUM 0.44 1 $47,850.00 $21,005 <br /> SUBTOTAL $258,050 <br /> +15%CONTINGENCY $38,708 <br /> +25%ENGINEERING $74,189 <br /> TOTAL <br /> CR E TREES(40'SPACING) <br /> JSID ITEM UNIT CITY UNIT COST TOTAL COST <br /> JINSTALL TREE EACH 103 $300.00 $30,900 <br /> SUB TOTAL $30,900 <br /> +15%CONTINGENCY $4,635 <br /> +25%ENGINEERING $8,894 <br /> TOTAL, $44,419 <br /> CR E SIDEWALK <br /> BID ITEM UNIT CITY UNIT COST TOTAL COST <br /> REMOVE CONCRETE WALK SF 3417 $1.46 $4,989 <br /> AGGREGATE BASE(CV)CLASS 5 CY 157 $19.84 $3,115 <br /> 4"CONCRETE WALK SF 12,685 $3.50 $44,398 <br /> TURF WORK I-SUM 1 $20,000.00 $20,000 <br /> SUBTOTAL $72,501 <br /> +15%CONTINGENCY $10,876 <br /> +25%ENGINEERING $20,844 <br /> TOTAL I $104,222 <br /> BOLTON MENK,INC. 12/5/2012 <br />