Laserfiche WebLink
CR E IMPROVEMENTS COST ESTIMATE <br /> ARDEN HILLS,MN <br /> PINE TREE DRIVE SIDEWALK <br /> BID ITEM UNIT QTY UNIT COST TOTAL COST <br /> AGGREGATE BASE(CV)CLASS 5 CY 89 $19.84 $1,766 <br /> 4"CONCRETE WALK SF 7,148 $3.50 $25,018 <br /> CROSSWALK MARKING-EPDXY SF 162 $5.81 $941 <br /> TURF WORK L SUM 1 $15,000.00 $15,000 <br /> SUB TOTAL $42,725 <br /> +15%CONTINGENCY $6,409 <br /> +2594 ENGINEERING 1 $12,283 <br /> TOTALI $61,418 <br /> PINE TREE DRIVE SIGNAL REVISION <br /> BID ITEM I UNIT QTY UNIT COST TOTAL COST <br /> SIGNAL REVISIONS AND ADA IMPROVEMENTS L SUM 1 $50,000.00 $50,000 <br /> SUBTOTAL $50,000 <br /> +15%CONTINGENCY $7,500 <br /> +25%ENGINEERING $14,375 <br /> TOTAL $71,875 <br /> CONNELLY STREET SIGNAL REVISION <br /> BID ITEM UNIT QTY UNIT COST TOTAL COST <br /> SIGNAL REVISIONS AND ADA IMPROVEMENTS L SUM 1 $50,000.00 $50,000 <br /> SUBTOTAL $50,000 <br /> +15%CONTINGENCY $7,500 <br /> +25%ENGINEERING $14,375 <br /> TOTAL $71,875 <br /> LEXINGTON AVE SIGNAL REVISION AND WIDENING <br /> BID ITEM UNIT QTY UNIT COST TOTAL COST <br /> REMOVE BITUMINOUS PAVEMENT SY 3,711 $2.83 $10,502 <br /> REMOVE CONCRETE MEDIAN SY 186 $4.92 $917 <br /> REMOVE CURB&GUTTER LF 938 $3.60 $3,377 <br /> SAWING BIT PAVEMENT LF 1,150 $5.00 $5,750 <br /> AGGREGATE BASE(CV)CLASS 5-12" CY 387 $19.84 $7,671 <br /> GRANULAR BORROW-12" CY 387 1 $10.62 $4,106 <br /> COMMON EXCAVATION-30" CY 967 $4.05 $3,915 <br /> BITUMINOUS WEAR COURSE-4" TON 281 $70.00 $19,649 <br /> BITUMINOUS NON-WEAR COURSE-2" TON 140 $60.00 $8,421 <br /> BITUMINOUS TACK COAT GAL 116 $2.00 $232 <br /> SEAL COAT SY 7,095 $1.75 $12,416 <br /> CONCRETE MEDIAN SY 285 $27.05 $7,709 <br /> CONCRETE CURB AND GUTTER LF 2,364 1 $14.00 $33,096 <br /> PAVT MSSG(LT/RT ARROW)EPDXY EACH 11 $117.00 $1,287 <br /> 4"SOLID LINE WHITE-EPDXY LF 1,741 $0.25 $435 <br /> 4"BROKEN LINE WHITE-EPDXY LF 278 $0.25 $70 <br /> 4"SOLID LINE YELLOW-EPDXY LF 648 $0.25 $162 <br /> 24"SOLID YELLOW-EPDXY LF 195 $5.75 $1,121 <br /> 4"DOUBLE SOLID LINE YELLOW-EPDXY LF 886 $0.50 $443 <br /> 4"BROKEN LINE YELLOW-EPDXY LF 130 $0.25 $33 <br /> CROSSWALK MARKING-EPDXY SF 486 $5.81 $2,824 <br /> TRAFFIC SIGNAL L SUM 1 $250,000.00 $250,000 <br /> TURF WORK L SUM 1 $10,000.00 $10,000 <br /> TRAFFIC CONTROL AND STAGING L SUM 1 1 $5,000.00 $5,000 <br /> SUB TOTAL $389,134 <br /> +15%CONTINGENCY $58,371 <br /> +25%ENGINEERING $111,876 <br /> TOTAL $559,382 <br /> BOLTON MENK,INC. 12/5/2012 <br />