My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Planning Case 12-019 - Master and Final PUD at 1201 County Road E
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
12-17-12-Special
>
7C, Planning Case 12-019 - Master and Final PUD at 1201 County Road E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 2:37:44 PM
Creation date
12/13/2012 2:37:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant is also proposing a number of site improvements. Included in the improvements is <br /> a complete reconstruction of the existing parking lot, inclusion of stormwater ponding, curb, <br /> gutter, and parking lot islands with landscaping, as well as additional landscaping throughout the <br /> site. The applicant is proposing additional parking stalls in front of the retail bays; however the <br /> bituminous drive aisle in front of the hotel portion of the building would be removed and <br /> landscaped. The center driveway access would be removed, and the two other access points <br /> would remain in their current locations. The applicant is also proposing to remove the front <br /> portico, which will increase the visibility from County Road E and update the look of the outside <br /> of the building. <br /> The applicant believes the target market for the apartments to be students; however, as a market <br /> rate apartment building, the landlord must rent to anyone that is approved through the rental <br /> application process. <br /> The applicant has submitted a letter outlining the reasons for the request and a plan set <br /> (Attachment E). <br /> Plan Evaluation <br /> A full evaluation of the proposal was presented to the Planning Commission at their November <br /> 28, 2012, Special Meeting. The report to the Planning Commission regarding this application is <br /> included as Attachment E. <br /> Discussion <br /> Ramsey County Easement Request <br /> In light of the County Road E Implementation planning process,the County has identified a need <br /> for a dual left turn from eastbound County Road E to northbound Lexington Avenue. Ramsey <br /> County has reviewed the proposed plans and has requested an easement along County Road E <br /> and at the corner of County Road E and Lexington Avenue. The easement would accommodate <br /> a future dual left turn lane on County Road E, as well as signaling and signage. The applicant <br /> has incorporated this request into the submitted plans. <br /> City Easement Requests <br /> Until the dual left turn lane is engineered, the exact location of a sidewalk along County Road E <br /> in front of the property cannot be determined. Staff has requested an additional 8-foot easement <br /> north of the County's easement request that will accommodate a future sidewalk, which will be <br /> City of Arden Hills <br /> City Council Meeting for December 17, 2012 <br /> P:IPlanningWlanning Cases12012112-019-1201 County Road E-PUD MAster and Final Plan112-17-12-Holiday Inn-CC Memo.docx <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.