My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Proposals for Engineering Services - South Water Tower Rehabilitation
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
01-28-13-R
>
8A, Proposals for Engineering Services - South Water Tower Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2013 12:39:28 PM
Creation date
1/24/2013 12:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2013 thru 2017 Department Water Department <br /> City of Arden Hills, Minnesota <br /> Contact Public Works Director <br /> Type Operational Maintenance <br /> Project# 12-W-001 <br /> Useful Life 15-17 <br /> Project Name Water Towers Repair and Repainting Category Utility Maintenance <br /> Priority 3 Important °1 <br /> CD <br /> 0 <br /> Total Project Cost: $1,457,000 r <br /> Description <br /> The City has two water towers;a 500,000 gallon north tower and a 1,000,000 gallon south tower.Based on a 2005 inspection report some <br /> improvements are needed at the south tower.The north tower was last inspected in 2000 and repairs were undertaken in 2001. <br /> In 2012 both water towers were inspected inside and outside using the"float down'method by Kollmer Consultants,inc of Stacy MN.Based upon <br /> these inspections the recommendation is to make minor structural modifications to each of towers together with a complete stripping of the existing <br /> paint and a full repainting.Kollmer recommended that the south water twoer be completed in the next 1 to 2 years and the north water tower be <br /> ,completed in the next 2 to 3 years. <br /> Justification <br /> In order to proceed with the repairs at the both towers plans and specs need to be prepared based on an actualy most recent inspection of the towers <br /> by Kollmer Consultants. <br /> Prior Expenditures 2013 2014 2015 2016 2017 Total <br /> 7,000 Construction/Maintenance 900,000 550,000 1,450,000 <br /> Total Total 900,000 550,000 1,450,000 <br /> Prior Funding Sources 2013 2014 2015 2016 2017 Total <br /> 7,000 Water Utility Funds 900,000 550,000 1,450,000 <br /> Total TOW 900,000 550,000 1,450,000 <br /> Budget Impact/Other <br /> Produced Using the Plan-/t Capita!Planning Software <br /> Tuesday,October 30,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.