As can be seen from the table above, BMI provided the lowest total fee for the complete <br /> project work scope. Staff would recommend entering into a contract with BMI in an <br /> amount not to exceed $48,800 for the engineering and inspection work for the <br /> rehabilitation of the South Water Tower. <br /> A tentative schedule of the project would be as follows: <br /> • Pre-design Services February 2013 <br /> • Plans/Specifications March 2013 <br /> • Bidding April/May 2013 <br /> • Start Construction June/July 2013 <br /> • Project Complete (14 Weeks) September/October 2013 <br /> During the time that the tower is out of service, the City's water pressure and storage will <br /> be provided from a tower in Roseville's system. Roseville has already been made aware <br /> of our project. They actually have a planned tower work on their system in 2014 when <br /> our tower will provide backup to them. <br /> Council Action Requested <br /> Authorize entering into a contract with Bolton and Menk for the engineering and <br /> inspection services for the South Water Tower Rehabilitation Project on an hourly basis <br /> not to exceed $48,800. <br /> City Council Meeting <br /> C:\Users\sonja.klingberg\Desktop\I-28-13 South Water Tower Proposals.doc <br /> Page 2 of 2 <br />