Laserfiche WebLink
Transportation Policy Plan and recommend mitigation. The TIS shall provide <br /> Volume/Capacity analyses at: <br /> a. The 1-35W/Highway Avenue interchange; <br /> b. The 1-35W/CSAH 96 interchange, including the CSAH 96/Old Highway 8 <br /> intersection; <br /> c. The CSAH 96/spine road intersection, including the North Heights Lutheran <br /> Church access or Snelling Avenue intersection, whichever is aligned with the <br /> spine road; <br /> d. The CSAH 96/1-exington Avenue intersection; <br /> e. The impact of the development-generated traffic on the 1-35W/1-694 system <br /> interchange; and <br /> f. Truck Highway 10/CSAH 10/County Road H/Highway Avenue. <br /> 3. Traffic capacity at major intersections internal to the site based on proposed land uses. <br /> 4. Alignment and right-of-way plan for the spine road, including identified access points and <br /> right-of-way width, sufficient to apply for County State Aid highway status. <br /> 5. Typical sections of roads by type or sub-type including definition of amenities, street <br /> widths, and pedestrian/bicycle facilities. <br /> 6. Aesthetic design guidelines for roads and bridges. <br /> 7. Document defining: <br /> a. Right-of-way management and maintenance objectives <br /> b. Transit opportunities. <br /> Task 2.5 Utilities Component. The Utilities Component will include: <br /> • Coordination with private utility providers to ensure that proposed land uses are <br /> serviceable by private utilities; <br /> • Coordination with Xcel Energy, Ramsey County, and the City of Arden Hills on the future <br /> location of the Xcel substation; <br /> • Peak water needs and sanitary sewer flows for the land use plan; <br /> • Calculation of stormwater management needs for the proposed land use plan; and <br /> • Renewable energy opportunities. <br /> Task 2.5 Deliverables. <br /> 1. Documentation of peak water needs and sanitary sewer flow. <br /> 2. Written confirmation from private utilities that they are able to provide utilities to <br /> service the proposed land uses. <br /> 3. Map showing the location of the future Xcel substation. <br /> 4. Stormwater plan that includes regional stormwater amenities to meet Rice Creek <br /> Watershed District requirements for stormwater management. <br /> Task 2.6 Parks and Open Space Component. The Parks and Open Space Component will <br /> include: <br /> • Park and open space plan shall include: <br /> • A large central park; <br /> • Several smaller neighborhood parks; <br /> • Regional trail corridor; <br /> • Reference to trail/pedestrian/bicycle circulation plan; <br /> • Cost estimate; and <br /> Page 9 of 20 <br />