My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-13 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2013
>
05-21-13 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 10:01:01 AM
Creation date
5/22/2013 10:00:57 AM
Metadata
Fields
Template:
General
Document
5-21-13 PTRC Packet
General - Type
5-21-13 PTRC Packet
Category
5-21-13 PTRC Packet
Date
5/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eliminate the need for a soil sample because the existing soils will be dug up and <br />replaced with planting soil and drain tile will be added. <br /> <br />Estimated cost for proposed improvements above: $66,000 <br />(includes labor) <br /> <br />Two added improvements NOT included in the proposed project and are not recommended by <br />staff are: <br /> <br /> Paint the outside of the hockey rink <br />1. This will be $1,500 for the paint and one <br />week of labor time for one staff member. Once the outside of the rink is painted, it <br />will need to be redone every 1-2 years. If painting is an improvement that the <br />committee still would like to recommend, staff suggests painting the outside with a <br />forest green color. <br /> <br /> Plexiglas on each end of the hockey rink <br />2.Staff received a quote for $1,554.73 per <br />sheet plus $750 shipping. It is estimated that we would need 12 sheets for a total of <br />$18,656.76. The maintenance of the rink would be affected by adding Plexiglas <br />because our staff dumps snow over the boards on each end and the fencing allows <br />that. Plexiglas on each end would make the snow removal process more difficult. <br /> <br />Requested Action <br /> <br />To review the Freeway Park Enhancements and recommend a proposed project in order for staff <br />to include in the Capital Improvement Program for 2014. <br /> <br />22 <br />Page of <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.