My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-13-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
06-17-13-WS
>
06-17-13-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 6:11:52 PM
Creation date
6/13/2013 6:11:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.Added Perry #4 Field Renovation. Staff contacted the Association to consider <br />splitting the cost to renovate Perry #4 ball field. It is in poor condition and <br />improvements to this field would benefit both the City and the Association. The <br />$20,000 listed in the CIP is 100% of the total project. <br /> <br /> <br />6.Added Floral Park Hard Court Reconstruction in 2018 for consideration. The <br />court was resurfaced in 2012 and is in need of reconstruction to resolve structural <br />cracks. <br /> <br /> <br />7.Placed the Mounds View High School Trail Connection in 2015 for discussion <br />purposes. If construction is to happen in 2015, plans need to be finalized in <br />2014. <br /> <br /> <br />8.Added a bridge item for all the MNDOT bridges coming up: if the City, the <br />County and New Brighton were to ask for pedestrian facilities on both sides; we <br />will have a financial involvement. <br /> <br /> <br />9.Added some sidewalk/trail items that will need to be built if pedestrian facilities <br />are added to new bridges such as County Road E (TH 51 to Old Hwy 10); <br />Moundsview HS trail over Lake Valentine Bridge and sidewalk on Hwy 96 from <br />Hamline to current project. <br /> <br /> <br />10.Moved West Round Lake Rd to 2014 and adjusted the cost to assume LS 11 is <br />eliminated with the project. <br /> <br /> <br />11.Gateway Signs <br />The project description, expenditures, funding, and budget impact have been <br />updated. A cost of $25,000 per sign including installation, lighting, and <br />landscaping was previously estimated. The CIP assumes that two gateway signs <br />will be installed in each of years 2014 and 2015 with locations to be determined <br />by the City Council. <br /> <br /> <br />12.Added a vehicle for Building Inspector and other City use. (Listed on yellow <br />Equipment pages) <br /> <br /> <br />13.Additional Camera for Council Chambers in 2016 <br /> <br /> <br />14.Item 11-EqpV-004 Replace Jetter and Vactor Truck with Combo Machine has <br />had the expenditure of $300,000 moved from 2013 to 2017 (Listed on yellow <br />Equipment pages) <br /> <br /> <br /> <br /> <br />City Council Meeting <br />P:\Admin\Council\Agendas & Packet Information\2013\06-17-13-WS\CIP\Memo.docx <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.