Laserfiche WebLink
LEGEND <br />950 <br />EXISTING CONTOURS <br />CONCRETE WASHOUT STATION <br />950 <br />PROPOSED CONTOURS - MAJOR INTERVAL <br />949 <br />PROPOSED CONTOURS - MINOR INTERVAL <br />SEDIMENT LOG <br />GRADE BREAK LINE <br />SPOT ABBREVIATIONS: <br />2.0% <br />GRADE SLOPE <br />950.00 TC <br />TC - TOP OF CURB <br />949.50 GL <br />SILT FENCE <br />GL - GUTTER LINE <br />B - BITUMUNOUS <br />RIP-RAP / ROCK CONST. ENTRANCE <br />C - CONCRETE <br />EO - EMERGENCY OVERFLOW <br />TW - TOP OF WALL (F/G) <br />INLET PROTECTION <br />BW - BOTTOM OF WALL (F/G) <br />934.5 TC* <br />G - FINISHED GRADE <br />934.0 GL* <br />RETAINING WALL IS FREE STANDING <br />FF - FINISHED FIRST FLOOR <br />ABOVE FINISHED GRADE. SEE <br />(*) - EXISTING TO BE VERIFIED <br />ARCHITECTURAL PLANS SHEET A3.2 <br />FOR HEIGHT OF WALL ABOVE GRADE. <br />EROSION CONTROL NOTES <br />1.Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this permit. The SWPPP shall <br />be kept onsite at all times. <br />2.Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to beginning any excavation or <br />demolition work at the site. <br />941.5 C <br />3.Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, <br />941.4 C <br />sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours as deemed necessary to further control erosion. <br />933.50 TC <br />All changes shall be recorded in the SWPPP. <br />933.00 GL <br />939.5 TW <br />935.2 C <br />4.All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the entrance to a point 50' <br />935.5 BW <br />934.8 GL <br />935.4 TC <br />into the construction zone. <br />940.9 F <br />934.9 GL <br />934.8 TC <br />934.3 GL <br />934.85 R <br />5. <br />940.8 C <br />935.90 TW <br />934.85 R935.93 TC <br />935.8 G <br />935.93 TC <br />934.85 R <br />934.85 R <br />935.93 TC <br />935.93 TC <br />935.90 BW <br />935.43 GL <br />935.43 GL <br />935.43 GL <br />935.49 TC935.43 GL <br />TRASH <br />6.All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control practices must be established <br />934.99 GL <br />ENCLOSURE <br />on all down gradient perimeters before any up gradient land disturbing activities begin. <br />934.45 TC <br />935.3 GL <br />F.F.E.=935.8 <br />932.80 B* <br />935.90 TC <br />933.95 GL <br />935.40 GL <br />7.All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 14 days after the construction activity <br />940.0 TW <br />935.8 FF/C <br />935.9 C <br />933.20 TC <br />935.8 BW <br />936.0 TC <br />in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without significant silt, clay or organic components (e.g., <br />936.0 C <br />932.70 GL <br />936.0 C <br />935.8 TC <br />935.5 GL <br />936.0 C <br />clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots and <br />934.07 TC <br />935.3 GL <br />935.8 TC <br />933.57 GL <br />similar surfaces are exempt from this requirement. <br />939.9 TW <br />935.8 G <br />935.3 GL <br />935.8 BW <br />936.0 FF <br />936.0 G <br />8.The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of the construction site, <br />935.86 TC <br />or diverts water around the site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge into any surface <br />935.36 GL <br />934.23 TC <br />water. Stabilization of the last 200 lineal feet must be completed within 24 hours after connecting to a surface water. Stabilization of the <br />933.73 GL <br />935.74 TC <br />remaining portions of any temporary or permanent ditches or swales must be complete within 14 days after connecting to a surface water and <br />935.08 C <br />935.24 GL <br />construction in that portion of the ditch has temporarily or permanently ceased. <br />935.83 C <br />9.Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface. <br />935.59 TC <br />934.8 R <br />935.75 TC <br />935.09 GL <br />932.81 TC <br />935.25 GL <br />935.8 TC <br />10.All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of Transportation Standard <br />932.31 GL <br />935.3 GL <br />Specifications. <br />932.41 B* <br />934.07 TC <br />936.0 C <br />938.8 TW <br />11.All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the respective wetland or water body <br />933.57 GL <br />936.0 BW <br />at an elevation where the downstream slope is 1 percent or flatter. The normal water level shall be the invert elevation of the outlet of the <br />936.0 FF <br />936.0 C <br />936.0 TC <br />wetland or water body. <br />936.0 FF <br />935.5 GL <br />936.0 FF <br />936.0 C <br />936.0 FF <br />936.0 FF <br />12.All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent runoff from entering the storm sewer <br />936.58 TW <br />system. Catch basins necessary for site drainage during construction shall be provided with inlet protection. <br />936.58 BW <br />935.68 TC <br />935.80 C935.80 TC <br />935.80 TC <br />935.80 TC935.18 GL <br />13.In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes) the erosion control facilities shall <br />935.80 TC <br />935.30 GL <br />935.30 GL <br />935.30 GL <br />be backed by stabilization structure to protect those facilities from the concentrated flows. <br />935.30 GL <br />936.23 TC <br />932.00 R <br />933.50 TC <br />935.73 GL <br />933.00 GL <br />935.80 TC <br />14.Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in <br />935.30 GL <br />935.30 GL <br />24 hours. All inspections shall be recorded in the SWPPP. <br />935.70 TC <br />935.5 C <br />15.All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 1/3 of the height of the <br />935.20 GL <br />fence. These repairs must be made within 24 hours of discovery, or as soon as field conditions allow access. All repairs shall be recorded in the <br />932.70 TC <br />935.0 GL <br />SWPPP. <br />932.20 GL <br />935.49 TC <br />934.99 B <br />934.99 B <br />934.99 GL <br />934.75 B <br />933.98 R <br />16.If sediment escapes the construction site, off-site accumulations of sediment must be removed in a manner and at a frequency sufficient to <br />932.40 B <br />minimize off-site impacts. <br />934.78 B/EO <br />934.66 R <br />934.5 GL/EO <br />934.78 B <br />17.All soils tracked onto pavement shall be removed daily. <br />932.70 TC <br />18.All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the infiltration area and these <br />935.35 TC <br />932.20 GL <br />areas are protected from compaction due to construction equipment driving across the infiltration area. <br />934.85 GL <br />935.4 TC <br />934.22 TC <br />934.98 R <br />935.0 R <br />935.88 TC <br />934.9 GL <br />933.72 GL <br />932.00 R <br />935.10 R <br />935.88 TC <br />19.Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in surface waters, including stormwater <br />935.38 GL <br />935.38 GL <br />936.75 C <br />conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater. <br />935.15 R <br />931.75 C <br />932.25 C <br />935.9 C <br />20.Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes <br />935.4 C <br />936.53 C <br />must be disposed of properly and must comply with MPCA disposal requirements. <br />2% <br />937.0 G <br />936.53 C <br />932.00 TC <br />21.Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment, to prevent spills, leaks or other <br />SWALE <br />931.50 GL <br />discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste must be in <br />I hereby certify that this plan, <br />936.03 GLcompliance with MPCA regulations. <br />935.40 B <br />specifications or report was prepared <br />935.3 G* <br />936.55 TC <br />by me or under my direct supervision <br />932.5 C* <br />936.05 GL <br />22.External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and waste <br />and that I am a duly licensed <br />930.90 R <br />properly disposed of. No engine degreasing is allowed onsite. <br />Professional Engineer under the laws <br />936.14 TC <br />935.74 TC936.0 G <br />of the state of Minnesota. <br />935.64 GL <br />935.24 GL <br />23.All liquid and solid wastes generated by concrete washout operations must be contained in a leak-proof containment facility or impermeable liner. <br />933.20 TC <br />932.46 TC <br />933.3 C <br />935.95 B* <br />A compacted clay liner that does not allow washout liquids to enter ground water is considered an impermeable liner. The liquid and solid <br />932.5 C <br />932.70 GL <br />931.96 GL <br />wastes must not contact the ground, and there must not be runoff from the concrete washout operations or areas. Liquid and solid wastes must <br />936.54 TC <br />932.3 C <br />936.04 GLbe disposed of properly and in compliance with MPCA regulations. A sign must be installed adjacent to each washout facility to inform concrete <br />936.14 TC <br />931.91 TC <br />equipment operators to utilize the proper facilities. <br />Michael A Murphy, P.E. <br />935.64 GL <br />931.41 GL <br />933.22 TC <br />Date: Reg. No.:05.17.1342808 <br />24.Upon completion of the project and stabilization of all graded areas, all temporary erosion control facilities (silt fences, hay bales, etc.) shall be <br />932.72 GL <br />removed from the site. <br />933.32 C <br />932.32 TC <br />935.35 TC* <br />935.30 TC <br />931.82 GL <br />936.0 B* <br />934.85 GL* <br />934.80 GL* <br />Rev.DateDescription <br />25.All permanent sedimentation basins must be restored to their design condition immediately following stabilization of the site. <br />934.80 B* <br />105.17.13Bldg. Permit Submittal <br />26.Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after Final Stabilization. <br />205.28.13City Submittal <br />GRADING NOTES <br />306.05.13Bid Package #1 <br />933.02 TC <br />CONCRETE WASHOUT <br />933.24 TC <br />932.52 GL <br />932.74 GL <br />1.Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginning any grading or demolition <br />933.34 Cwork at the site. <br />ROCK <br />935.5 B* <br />2.Allelevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer for further instructions. <br />CONSTRUCTION <br />932.05 TC <br />932.05 B* <br />ENTRANCE <br />931.55 GL <br />3.Grades shown in paved areas represent finish elevation. <br />12136036.000 <br />Project #: <br />4. <br />Drawn By:SJM / CKJ <br />5.All construction shall be performed in accordance with state and local standard specifications for construction. <br />Checked By: <br />ZRE / MAM <br />Issue Date: <br />05.15.13 <br />6.The project intent is to balance cuts and fill volumes on site. Grading modifications required to balance earthwork shall be approved by the <br />Engineer. <br />Sheet Title: <br />GRADING AND <br />7.Finish grading shall be completed prior to irrigation installation. It is anticipated that finish grading touch <br />EROSION CONTROL <br />up will be needed after irrigation installation. <br />PLAN <br />Sheet: <br />NORTH <br />C3 <br />0 <br />102040 <br />Sheet:5ofof10 <br />M:\Projects\Projects - 2013\12136036- Lexington Station\C. Design\Drawing Files\12136036 C3 - Grading.dwg <br />ALL EXISTING ITEMS AND CONDITIONS SHOULD BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION <br />