Laserfiche WebLink
Elfering and Associates $13,790 <br /> Kimley Horn $25,680 <br /> Bolton and Menk $38,250 <br /> <br />Staff has met with Elfering and Associates to review their proposal to ensure that they had all <br />requested items included. Staff is comfortable that the Elfering proposal is complete and will <br />provide a complete feasibility report. It should be noted that the Request for Proposals states that <br />the City will hire a geotechnical firm to provide a report on the subsurface soil conditions to be <br />used in the preparation of the feasibility report so that will be an additional cost. <br /> <br />Recommendation <br /> <br />Staff has requested and received three proposals from engineering consultants for the preparation <br />of the Round Lake Road feasibility report. After reviewing the three proposals, staff <br />recommends that Elfering and Associates be retained at a cost not to exceed $13,790 for the <br />preparation of the Round Lake Road feasibility report. <br /> <br />Attachment <br /> <br />Copy of the Request for Proposals <br />22 <br />Page of <br /> <br />