My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, Lift Station #1 and #12 Reconstruction Bids
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
04-30-12-R
>
8A, Lift Station #1 and #12 Reconstruction Bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2013 8:35:03 AM
Creation date
11/18/2013 8:34:59 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City supplied equipment would be purchased from Electric Pump Company and <br /> would be exactly the same for each of the two lift stations. Attached is the quote from <br /> Electric Pump Company. For each lift station the pumps would cost $18,850 and the <br /> control panel would cost $28,000. Sales tax of 6.875% would need to be added to this <br /> price for a total of$50,059.23 per lift station. <br /> The Capital Improvement Plan (CIP)has an item in it in 2013 for rebuilding these two lift <br /> stations at a cost of$410,000 (a copy of this item is attached). Based on the low bid from <br /> Magney Construction and the quote for a pump and control panel from Electric Pump <br /> Company, the following table summarizes the total project cost. <br /> Total Project Cost Summa <br /> Magney Construction Bid (rebuild lift station#1 ) $266,800 <br /> Magney Construction Bid Alternate (replace forcemain $24,820 <br /> lift station#12) <br /> Electric Pump Quote (pumps &control panel with tax) $100,118.46 <br /> Overhead Costs (design, geotechnical, construction $26,000 <br /> engineer) <br /> Total Project Cost $417,738.45 <br /> i <br /> Council Action Requested <br /> Staff would recommend that the City Council award the bid for the reconstruction of Lift <br /> Stations #1 and #12 to Magney Construction including Alternate 1.0 for the new <br /> forcemain at Lift Station #12 as the lowest responsible bidder in the amount of$291,620. <br /> Staff would also recommend that the City Council authorize the purchase of pumps and <br /> equipment for Lift Stations #1 and #12 from Electric Pump Company in the amount of <br /> $100,118.46. <br /> City Council Meeting <br /> P:\Admin\Council\Agendas&Packet Information\2012\04-30-12 Reg Mtg\Packet Information\4-30-12LS1&12Bids.doc <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.