My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 2013
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2013
>
December 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2013 12:40:26 PM
Creation date
12/12/2013 12:40:24 PM
Metadata
Fields
Template:
General
Document
December 2013 Newsletter
General - Type
December 2013 Newsletter
Category
December 2013 Newsletter
Date
12/1/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benchmarks: <br />a review of recent City Council action <br />October 14, 2013 Approved the Cable Services Agree <br />Tabled approval of Ordinance 2013- <br />" <br />" <br />- <br />ment between the City and North <br />009 for amendments to Section <br />Approved a joint powers agreement <br />" <br />Suburban Access Commission (5-0) <br />1305.04 and Section 1320 of the Zon <br />with Ramsey County for new voting <br />- <br />ing Code and Ordinance 2013-010 for <br />system acquisition and operation <br />Approved an agreement with SEH <br />" <br />amendments to Section 1320 of the <br />(5-0) <br />for $5,000 for technical review and <br />Zoning Code related to the proposed <br />inspection services for an AT&T <br />Approved Ordinance 2013-009 <br />" <br />Conservation District (5-0) (tabled to <br />antenna upgrade project at the Cum <br />amending Section 335 of the City <br />- <br />a work session for discussion) <br />mings Park water tower (5-0) <br />Code regulating residential rental <br />Tabled consideration of Planning Case <br />properties (5-0) (the proposed <br />" <br />" <br />13-013 for a conditional use permit <br />Pearson Brothers, Inc., for the 2013 <br />at 2 Pine Tree Drive to allow a higher <br />occupancy limit within the rental <br />Seal Coat Improvement in the amount <br />regulations section of the City Code <br />of $96,434 (5-0) <br />building (5-0) (City Council was not <br />and allows the City to issue citations <br />" <br />able to complete consideration due to <br />for violations of the limit) <br />Construction, LLC, for the 2013 Sani <br />lateness of evening.) <br />- <br />Approved Resolution 2013-039 or <br />" <br />tary Sewer Lining Improvement in the <br />- <br />dering an Alternative Urban Areawide <br />November 12, 2013 <br /> (Werner excused) <br />Amount of $311,869 (5-0) <br />Review for the TCAAP redevelop <br />- <br />Continued consideration of Plan <br />" <br />" <br />- <br />ment site (5-0) <br />ning Case #13-013 to the November <br />Ace Blacktop for the North Snelling <br />Approved the Zoning Scenario and <br />25, 2013, City Council meeting for <br />" <br />mill and overlay improvement in the <br />Maximum Development Scenario <br />a Conditional Use Permit at 2 Pine <br />amount of $104,291 (5-0) <br />for the TCAAP redevelopment site <br />Tree Drive (4-0) (Bethel CUP request <br />Approved Planning Case #13-016 for <br />" <br />Tree Drive (4-0) (Bethel CUP request <br />Alternative Urban Areawide Review <br />continued to allow the full council to <br />two variances to allow the proposed <br />be available for consideration of this <br />construction project located at 1226 <br />dated October 10, 2013 (3-2; Holden, <br />item) <br />Ingerson Road (3-2; Holden, Holmes) <br />Holmes) <br />Tabled approval of the 2014 tree re <br />" <br />- <br />Approved construction of a gateway <br />moval services contract for discussion <br />" <br />sign on the south side of County Road <br />at a work session (4-0) <br />and the second variance would allow <br />E and Cleveland Avenue in an amount <br />Accepted the Third Quarter Financial <br />" <br />not to exceed $17,000 (4-1 McClung) <br />to expand the existing deck, construct <br />Reports (4-0) <br />a front entrance overhang, and add <br />October 28, 2013 <br />sunshades to the south facing eleva <br />- <br />Adopted changes to the Arden Hills <br />" <br />tions of the home) <br />Personnel Policy (5-0) <br />Scenario 2 uses the same time frame but <br />try Financial, and SRF Consultingthe <br />in writing its intent to continue to wel <br />- <br />shows slightly higher overall numbers. <br />come use of this area by the public. The <br />Bethel has submitted a letter indicating it <br />evening included a public hearing, with <br />has no plans for any additional building on <br />several people addressing the Council. <br />- <br />the site. <br />ing, and public use of the walking trails <br />currently on the property. These trails are <br />Because it was growing late and the <br />The City Council spent over an hour at the <br />in a buffer zone established between the <br />Council had several additional points <br />meeting gathering information from City <br />business area of the property and adjacent <br />to discuss, it was decided to table the <br />staff, and representatives of Bethel, Coun <br />residential neighborhoods. Bethel has stated <br />proposal until a future meeting. <br />- <br />Bethel University Expansion Plan Time Frame <br />Time Frame Staff/Faculty Classrooms Classroom SeatsDescription <br /> <br />Phase 1: 2013-2014 35 9 300 Original 26,000 sq. ft. Conditional Use Permit <br /> <br />Phase 2: 2015-2018110 6 260 Available spaces on levels 2, 3, and 5 <br /> <br />Phase 3: 2018-2025 35 3 110 Available spaces on levels 1 and 4 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.