My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 2013
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2013
>
December 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2013 12:40:26 PM
Creation date
12/12/2013 12:40:24 PM
Metadata
Fields
Template:
General
Document
December 2013 Newsletter
General - Type
December 2013 Newsletter
Category
December 2013 Newsletter
Date
12/1/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECR-WSS <br />PRST STD <br />U.S. Postage Paid <br />St. Paul, MN <br />Permit #1962 <br />Arden Hills, MN <br /> 55112-5734 <br />. <br />I <br />City weighs utility fees <br />n <br />Postal Customer <br />Bethel proposes expansion <br />s <br />i <br />TCAAP environmental review begins <br />d <br />e <br />Notes from the City Council <br />Road Construction Season Ends! <br />here is a saying in Minnesota that Another interesting aspect of having High <br />T <br />way 96 was being redone and because it <br />- <br />there are only two seasons, winter way 10 open is that drivers will be able to <br />limits any future need to close Highway 96 <br />and road construction. Personally, I see the cleanup that has been going on at <br />to add a turnoff. <br />am glad to be moving into the winter seaTCAAP. As cleanup started early this year, <br />- <br />Highway 10 had only limited access at the <br />Other road improvements in Arden Hills <br />construction. For Arden Hills it has been northern area of TCAAP near I-35W. So <br />are scheduled for future years, but noth <br />- <br />like the perfect storm for road construction far all but one building has been removed, <br />ing as extensive as I-694 and Highways <br />with highways 10 and 96 closed, I-694 building number 502 which is located <br />10 and 96. One of the planned improve <br />- <br />with delays and a short bit of construction along Highway 96. Asbestos will be re <br />ments is the reconstruction of the County <br />- <br />along Lexington Avenue near Target. This moved ne during the winter months and the <br />Road E Bridge over Snelling Avenue. The <br />letter will reach you in early December and building will be taken down next spring. <br />plan will include a long needed and often <br />by that time Highways 10 and 96 should <br />requested safe pedestrian walkway. <br />be open and the I-694 repairs will have The work on TCAAP this year has <br />been completed. Having Highways 10 and removed what some called an eyesore. <br />The holiday season is upon us and that <br />96 open to both I-35W and I-694 means While there may be some construction de <br />means a lot of travel for some families. <br />- <br />several things:bris visible, it is certainly not as unsightly <br />Our major roads are done and in good <br />as the old buildings were. Other work <br />shape. I want to wish you and your family <br />this year included a median cut to TCAAP <br />safe travels on whatever road you choose. <br />northern Arden Hills will be available on on Highway 96. It was done in large part <br />Highway 96, with quicker access to I-35W, because it makes sense to do it while High <br />- <br />one of our primary north/south routes. It <br />David Grant, Mayor <br />also means easier access to Mounds View <br />High School for people living in northern <br />Monday-Friday, 4:30-8:30 p.m. <br />Arden Hills. For residents living west of <br />Arden Hills skating rinks will be open <br />Saturday, 10 a.m.-8:30 p.m. <br />Snelling Avenue, it means being able to <br />from December 9 to February 17if <br />Sunday, 1-7 p.m. <br />get on Highway 96 without having to take <br />weather conditions permit. They are <br />County Road E and go north on Hamline <br />located at: <br />or Lexington avenues. Having Highway <br />Cummings Park1220 Wyncrest <br />" <br />Dec. 23, 26, 27, 3010 a.m.-8:30 p.m. <br />10 open should, to some degree, reduce <br />Court (Pleasure rink only) <br />Christmas Eve10 a.m.-5 p.m. <br />Freeway Park1370 West County <br />" <br />New Years Eve10 a.m.-5 p.m. <br />is what MnDOT is planning for. Having <br />Road E <br />New Years Day10 a.m.-8:30 p.m. <br />these roads open again could make for an <br />Hazelnut Park3301 New Brighton <br />" <br />interesting few months as drivers readjust <br />Road <br />10 a.m.-8:30 p.m. <br />their driving patterns. Hopefully the long <br />Perry Park3700 New <br />" <br />Presidents Day, February 17 <br />wait has been worth it. <br />Brighton Road (Hockey rink <br />10 a.m.-8:30 p.m. <br />only) <br />
The URL can be used to link to this page
Your browser does not support the video tag.