My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-12-13-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
11-12-13-R
>
11-12-13-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 2:36:56 PM
Creation date
12/13/2013 2:36:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />1.Disposal of Trees <br />All logs and branches shall be removed from the property on which they are cut <br />and disposed of by the Contractor in accordance with the rules and regulations of <br />the Minnesota Department of Agriculture. Logs or brush stored safely on site <br />must be removed the following day. No material shall ever be stored in the street <br />or at a location that might impair safety of driving or walking. <br />2.Chipping <br />a.City streets may be used for the Contractor's chipping operation. <br />The Contractor will be required to clean-up the street and <br />boulevard after the chipping operation. <br />b.Chips may be deposited upon a pre-selected site in the City <br />providing the Contractor has permission from the City specifying <br />the dumping site and the amount allowed. <br />3.Stump Removal <br />a.All stumps and roots will be removed to a distance of not less than <br />twelve inches (12") below established grade between the curb and <br />sidewalk. If no sidewalk exists, grade is considered below the <br />curb, or as determined by the Public WorksDirector. <br />b.The Contractor will remove all chips and other debris caused by <br />the stump removal operation. <br />c.The Contractor will furnish and spread soil of a quality equal to or <br />better than soil of abutting areas, over the areas of the removed <br />stump and all other areas disturbed by theiroperation, to a level <br />equal to or greater than the adjacent area. No brush, chips, stumps, <br />etc., shall be used as filler in such holes. No holes are to be left <br />open overnight. <br />d.The Contractor will spread grass seed onall disturbed soil areas. <br />Thegrass seed will be provided by the tree Contractor. <br />e.If, in the event the Public WorksDepartment deems it impractical <br />and/or unnecessary to remove the stump, it may direct the <br />Contractor to debark the stump to a point two inches (2") above <br />ground level. <br />26 <br />Page of <br />
The URL can be used to link to this page
Your browser does not support the video tag.