Laserfiche WebLink
4.Tree Measurement <br />Trees will be measured at 4 feet off ground level.Those trees forking below the 4 <br />foot mark will be measured directly below the union and can be considered one <br />tree. <br />5.Delay Penalty <br />If the removal work is not completed within the given deadline of 20 days; 30 <br />days for stumps, (allowing for excusable delays), a sum of $25.00 per day per list <br />may be deducted from the payment. <br />6.Protection and Restoration of Property <br />The Contractor shall not enter upon private property without having previously <br />obtained permission from the Owner. The Contractor shall be responsible for the <br />preservation of, and shall use every precaution to prevent damage to all trees, <br />shrubbery, plants, lawns, fences, culverts, bridges, driveways, sidewalks, etc.; all <br />water, sewer, gas lines; all conduits; all overhead pole lines or appurtenance <br />thereof; and all other public or private property along or adjacent to the work. Any <br />adjacent shrubs, trees or other growth receiving or sustaining breakage, injury or <br />other damage during the removal project shall be given remedial or corrective <br />treatment, and cleanup. <br />The Contractor shall notify the proper representative of any public utility <br />forty-eight (48) hours <br />corporation and company or individual, not less than in <br />advance of any work which might damage or interfere with the operation of their <br />Gopher State One Call <br />utilitiesor property along or adjacent to the workzone. <br />telephone number 1-800-252-1166. <br />The Contractor shall be responsible for all damages or injury to property of any <br />character resulting from any act, omission, neglect, or misconduct in the manner or <br />method of executing the work, or due to non-execution of the work, or at any time <br />due to defective work or materials. <br />The Contractor shall restore, or have restored at his/her own cost and expense, such <br />property to a condition similar or equal to that existing before such damage or <br />injury was done, by repairing, rebuilding, or otherwise restoring as may be <br />directed, or shall make good such damage, or injury in a manner acceptable to the <br />Owner and the City. <br />The City shall be indemnified and held harmless from any suit, or expense claim <br />brought for or on account of any damage, maintenance, removal and/or <br />replacement or relocation of mains, conduits, pipes, poles, wires, cables or such <br />other structures of private utility firms, or corporation, whether underground or <br />overhead, that may be caused or required by the Contractor during the time the <br />work is in progress. <br />36 <br />Page of <br />