Laserfiche WebLink
the City of Arden Hills and a new hydrant and valve, supplied by the development will be <br />connected and installed in the boulevard along County Road E. <br /> <br />12.Provide the city with a copy of the maintenance agreement for the stormwater pond as <br />required by the Rice Creek Watershed permit for e Street flats. <br /> <br />13.Provide an anticipated construction schedule for site improvements and the construction <br />of the building. <br /> <br />14.A Rice Creek Watershed permit may be required for the site. Please provide a copy of <br />this permit once it has been issued. A NPDES construction permit will be required for the <br />site, please provide a copy of this permit once it has been issued. <br /> <br />15.A Ramsey County ROW permit will be needed for work in the County Road E and <br />Lexington Ave Right of Way. <br /> <br />16.A City of Arden Hills Grading and Erosion Control Permit will be required for the work <br />proposed. As part of the Grading and Erosion Control permit a Erosion and Sediment <br />control plan needs to be submitted. <br /> <br />17. <br />At the completion of the project an as-built survey will be required. The survey should <br />be submitted for review and approval. Once the survey is acceptable the City requires <br /> <br />one mylar and two paper full size copies along with Autocad and PDF digital files. <br />. P:\PR&PW\Numbered Projects\PW-13-0112 Goodwill Lexington and co rd E\12-11-13 plan review.doc <br /> <br /> <br />Page 2 of 2 <br />