My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
01-13-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 1:08:05 PM
Creation date
1/17/2014 1:07:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 13, 2014 <br /> <br /> Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br />Matthew Bachler, Planner I <br />Boston Scientific Corporation <br />4100 Hamline Avenue North <br />Planned Unit Development Amendment and Site Plan Review <br />Motion to approve Planning Case 13-021 for a Planned Unit Development Amendment and Site <br />Plan Review at 4100 Hamline Avenue North, based on the findings of fact and submitted plans, <br />as amended by the five (5) conditions in the January 13, 2014, Report to the City Council. <br />Boston Scientific is requesting a Master PUD Amendment and Site Plan Review to construct a <br />1,310 square foot addition on the west side of Building 14, which is located in the northwest <br />quadrant of the Boston Scientific Campus. Building 14 is also identified on the campus Master <br />Plan as Building N. The purpose of the addition is to house mechanical equipment used for <br />manufacturing. <br />Specific pieces of equipment would include three air compressors, two air dryers, two vacuum <br />pumps, one compressed air storage tank, and one vacuum storage tank. Upon completion of the <br />addition, Boston Scientific will discontinue the use of three pieces of equipment (two vacuum <br />pumps and an air compressor)inthe existing mechanical room on the north side of Building 14. <br />One piece of equipment (an air compressor)willbe relocated and used in the new addition. <br />Thesingle story addition would match the existing adjacent roofline at approximately 22 feet <br />above grade. The building will be constructed of concrete masonry with steel joists and adeck <br />roof structure. EIFS with color and reveal pattern to match the existing construction will be used <br />City of Arden Hills <br />City Council Meeting for January 13, 2014 <br />P:\Planning\Planning Cases\2013\PC 13-021 - PUD Amendment - Boston Scientific\Memos_Reports_13-021 <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.