Laserfiche WebLink
as the principal exterior finish. The existing landscaped area where the addition will be <br />constructed is turf grass. All areas disturbed by the construction will be restored to their natural <br />condition. Two spruce trees equivalent to the City <br />the vicinity of the addition near the western property line. <br />The campus Master Plan was originally approved in 2002. A total of 419,500 square feet of <br />building space was proposed for Phase 1, which was scheduled to be completed in 2006. Due to <br />the change in ownership from Guidant to Boston Scientific in 2006, as well as other market <br />conditions, portions of Phase 1 have not been constructed. Two new buildings (L and K) and an <br />addition to Building I were expected to be finished during Phase I. Of this additional building <br />area, only Building L and the Building I addition have been built. Plans for Building K have not <br />yet been submitted. The Master Plan requires a traffic study be completed at the end of Phase 1. <br />Several amendments have been made to Phase 1 since 2002. The Building J addition was moved <br />from Phase 2 to Phase 1 (PC 04-01); however, this addition has not been constructed. Two <br />additions to Building N (14) were also approved for Phase 1 (PC 03-024 and PC 06-033), which <br />were built and added 40,250 square feet to the campus. The City has approved 296,250 square <br />feet of new space since the Master Plan was approved, of which 206,250 square feet have been <br />constructed. <br />PC 03-06L108,000112,000Yes <br />PC 03-07I52,30054,000Yes <br />Not yet submittedK259,2000No <br />PC 06-33N (14) 2,2502,250Yes <br />PC 04-01J80,00090,000No <br />PC 03-24N (14) 38,00038,000Yes <br />Proposed Addition (PC 13-21)N (14)1,3101,310Proposed <br />City of Arden Hills <br />City Council Meeting for January 13, 2014 <br />P:\Planning\Planning Cases\2013\PC 13-021 - PUD Amendment - Boston Scientific\Memos_Reports_13-021 <br />Page 2 of 5 <br />