Laserfiche WebLink
th <br />Master Plan PUD 8 2,250 square foot addition <br />06-033 11/27/06 (A) <br />Amendment to Building N <br />th <br />Master Plan PUD 7 10,225 square foot addition 08/28/06 (A) - <br />06-024 <br />Amendment to Building N Expired <br />th <br />Master Plan PUD 6 <br />06-010 Parking Modifications 04/24/06 (A) <br />Amendment <br />Installation of nitrogen <br />th <br />Master Plan PUD 5 <br />04-018 generator, vaporizers, and 10/25/04 (A) <br />Amendment <br />50-foot tall storage tank <br />th <br />Master Plan PUD 4 <br />04-017 Parking Modifications 07/12/04 (A) <br />Amendment <br />Satellite antennae for <br />04-013 Special Use Permit 07/12/04 (A) <br />Building L <br />04-004 Site Plan Review Temporary Walkway 02/23/04 (A) <br />rd <br />Master Plan PUD 3 Moving Addition J from <br />04-001 Amendment and Final Phase 2 to Phase 1 and 02/23/04 (A) <br />PUD slightly larger Addition J <br />nd <br />Master Plan PUD 2 Site layout change to allow <br />03-025 09/29/03 (A) <br />Amendment for Building N Addition <br />03-024 Site Plan Review Building N Addition 09/29/03 (A) <br />03-023 Site Plan Review Parking Ramp #1 09/29/03 (A) <br />03-007 Site Plan Review Building Addition I 03/31/03 (A) <br />03-006 Site Plan Review Building L 03/31/03 (A) <br />st <br />Master Plan PUD 1 Site layout changes to <br />03-005 03/31/03 (A) <br />Amendment Buildings I, K, L, and M <br />03-004 Final Plat Final Plat and Vacation 06/30/03 (A) <br />Master Plan PUD, Guidant 3-phase Master <br />02-025 11/12/02 (A) <br />Preliminary Plat Plan and Preliminary Plat <br />Lexington Avenue and <br />01-025 Sign Variances 09/24/01 (A) <br />Water Tower Signage <br /> <br /> <br /> <br />5.Boston Scientific Master Plan <br /> <br />The campus Master Plan was originally approved in 2002. A total of 419,500 square feet of <br />building space was proposed for Phase 1, which was scheduled to be completed in 2006. Due to <br />the change in ownership from Guidant to Boston Scientific in 2006, as well as other market <br />conditions, portions of Phase 1 have not been constructed. Two new buildings (L and K) and an <br /> <br />City of Arden Hills <br />Planning Commission Meeting for December 4, 2013 <br />P:\Planning\Planning Cases\2013\PC 13-021 - PUD Amendment - Boston Scientific\Memos_Reports_13-021 <br /> <br />Page 3 of 9 <br /> <br />