My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-21-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
01-21-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 4:02:59 PM
Creation date
1/17/2014 4:02:56 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGENDA ITEM 1B <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: January 21, 2014 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: CR E Bridge over TH 51 <br />I-694 MnDOT Landscaping Project <br /> <br /> <br /> <br />work session staff will present the current MnDOT layout for the County Road E <br />Bridge over TH 51. A small scale drawing of the bridge layout is attached. The layout shows <br />three 12 foot lanes - one in each direction and a center left turn lane. In addition there is a 6 foot <br />shoulder on the north side, a 6 foot shoulder on the south side and a 10 foot raised pedestrian <br />facility on the south side. <br /> <br />No formal approvals are needed from the City; however, if the City would like to have anything <br />added to the design, such as a pedestrian facility on the north side, it could be added as long as <br />the City is willing to pay for the cost of the additions. For budgeting purposes, MnDOT <br />estimates the bridge cost at $150 per square foot. <br /> <br />The second thing staff will have to present is the preliminary landscaping plan MnDOT has <br />prepared for the I-694 corridor following the construction that just concluded. A copy of the <br />plan sheets are attached. MnDOT budgeted $200,000 for this project. The project is scheduled <br />for an August 2014 letting with planting occurring in the spring of 2015. <br /> <br />The City Council placed a $5,000 item in the 2014 CIP should they want to make additions to <br />the MnDOT landscaping project. MnDOT would need a decision on any additions within the <br />next 45-60 days to get them into the final plan set. MnDOT has estimated that additional trees, if <br />added to the project, would cost between $275 and $375 each depending on the variety of tree. <br />Therefore, with a $5,000 budget, approximately 15 trees could be added if the Council so <br />desired. <br /> <br />Attachments <br />: <br /> <br />Attachment A: small scale drawing of the bridge layout <br /> <br />Attachment B: plan sheets <br /> <br />11 <br />Page of <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.