My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-06-13 EDC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2013
>
11-06-13 EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 9:05:01 AM
Creation date
1/28/2014 9:04:53 AM
Metadata
Fields
Template:
General
Document
11-6-13 EDC Packet
General - Type
11-6-13 EDC Packet
Category
11-6-13 EDC Packet
Date
11/6/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subarea –is proposed to exceed the maximum development studied. The AUAR will “test” the <br />development so the Cityhas information available to make informed decisions about level of <br />development and mitigation needed. <br />On October 14, 2013, the City Council issued an AUAR orderandapproved the following <br />development scenarios tobe evaluated in the TCAAP AUAR: <br />Zoning Scenario: <br />up to 1,500 residential units; 500,000 square feet of retail; and <br />1,700,000square feet of non-retail commercial. <br />This scenario is consistent with the City’s comprehensive plan and the associated <br />development limits included in the City’s zoning code. <br />Maximum Development Scenario: <br />up to2,500 residential units; 550,000 square feet of <br />retail; and 1,950,000 square feet of non-retail commercial. <br />This scenario increases the amount of development to maximum density based on the <br />anticipatedcapacity of the transportation network, including reconstructed intersections <br />at CR H and TH 10/CSAH 96,and an access to CR I. <br />Next Steps <br />The master planning process is on schedule. The consultants anticipate having a draft of the <br />Master Plan prepared for City Council review in December 2013. At the next TCAAP open <br />house in January/February 2014, attendees will be asked to provide feedbackon the draft Master <br />Plan. The final Master Plan and the draft AUAR are both expected to be completed in spring <br />2014. <br />Pioneer PressArticles <br />Pioneer Pressreporters worked with City and County staff over the past few months to develop <br />material for a series of TCAAP articles. Articles published in October are attached. <br />City of Arden Hills <br />Economic Development Commission November 6, 2013 <br />33 <br />Page of <br />
The URL can be used to link to this page
Your browser does not support the video tag.