<br />If this Preliminary Engineering Report is accepted by the City Council, the following schedule is <br />proposed: <br />Receive Preliminary Engineering Report (Resolution) ...................................................... December 9, 2013 <br /> <br /> <br />Authorize Final Plans & Specifications/ Order Boundary/Easement Evaluation .............. December 9, 2013 <br />Final Design/ Easement Acquisition ........................................................ December 2013 – December 2014 <br />(1) <br />Final Design Property Owner Walk-Thru .................................................................................... Fall 2014 <br /> <br />Order Improvement & Approve Final Plans/ Authorize Ad for Bids (Resolution) ................... January 2015 <br /> <br />Open Bids…. ............................................................................................................................ February 2015 <br />Accept Bids / Order Improvement Hearing and Assessment Hearing (Resolutions) .............. February 2015 <br />Conduct Improvement and Assessment Hearings/ Adopt Assessment Roll/ Award Project ...... March 2015 <br />(Resolutions) <br />Construction .............................................................................................................. April – September 2015 <br />(1) <br />The walk through with area property owners is to coincide with substantial completion of the design <br />documents (approx. 90% plans). The objective is to share the details of the final design with adjacent <br />property owners and to refine the design according to any special project concerns or circumstances that <br />might be identified during these discussions. <br />From an engineering standpoint, this project is feasible, cost effective, and necessary and can best be accomplished <br />by letting competitive bids for the work. It is recommended that the work be done under one contract in order to <br />complete the work in an orderly and efficient manner. The City, its financial consultant, and the persons assessed <br />will have to determine the economic feasibility of the proposed improvements. <br /> <br />