My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
02-24-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 4:32:24 PM
Creation date
2/21/2014 4:31:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL JANUARY 13, 201411 <br /> <br />Boston Scientific will discontinue the use of three pieces of equipment (two vacuum pumps and <br />an air compressor) in the existing mechanical room on the north side of Building 14. One piece of <br />equipment (an air compressor) will be relocated and used in the new addition. <br /> <br />Associate Planner Bachler <br /> explained that the single story addition would match the existing <br />adjacent roofline at approximately 22 feet above grade. The building will be constructed of <br />concrete masonry with steel joists and a deck roof structure. EIFS with color and reveal pattern to <br />match the existing construction will be used as the principal exterior finish. The existing <br />landscaped area where the addition will be constructed is turf grass. All areas disturbed by the <br />construction will be restored to their natural condition. Two spruce trees equivalent to the C <br />caliper inch requirements will be planted in the vicinity of the addition near the western property <br />line. <br /> <br />Associate Planner Bachler <br /> reported that the campus Master Plan was originally approved in <br />2002. A total of 419,500 square feet of building space was proposed for Phase 1, which was <br />scheduled to be completed in 2006. Due to the change in ownership from Guidant to Boston <br />Scientific in 2006, as well as other market conditions, portions of Phase 1 have not been <br />constructed. Two new buildings (L and K) and an addition to Building I were expected to be <br />finished during Phase I. Of this additional building area, only Building L and the Building I <br />addition have been built. Plans for Building K have not yet been submitted. The Master Plan <br />requires a traffic study be completed at the end of Phase 1. <br /> <br />Associate Planner Bachler <br /> reported that several amendments have been made to Phase 1 since <br />2002. The Building J addition was moved from Phase 2 to Phase 1 (PC 04-01); however, this <br />addition has not been constructed. Two additions to Building N (14) were also approved for Phase <br />1 (PC 03-024 and PC 06-033), which were built and added 40,250 square feet to the campus. The <br />City has approved 296,250 square feet of new space since the Master Plan was approved, of which <br />206,250 square feet have been constructed. <br /> <br />Associate Planner Bachler <br /> explained that a full evaluation of the proposal was presented to the <br />Planning Commission at their December 4, 2013, regular meeting. <br /> <br />Associate Planner Bachler <br /> indicated that the Zoning Code does not include specific regulations <br />regarding acceptable levels of noise. However, all properties in the City must meet the noise rules <br />classifications <br />Minnesota Pollution Control Agency (MPCA) has been given statutory authority to enforce the <br />State noise rules. It should be noted that the established State noise level standards preempt any <br />local regulations. <br /> <br />Associate Planner Bachler <br /> stated that Boston Scientific has retained ESI Engineering as an <br />acoustical consultant for the project. The firm has measured existing conditions to document <br />baseline noise levels. The survey results indicate that the noise from the existing mechanical <br />equipment located in Building 14 meets the MPCA nighttime noise requirements. <br /> <br />Associate Planner Bachler <br /> commented that Boston Scientific has taken several steps to ensure <br />that noise from equipment in the proposed addition will meet MPCA noise requirements. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.