Laserfiche WebLink
ARDEN HILLS CITY COUNCIL JANUARY 13, 201410 <br /> <br />Ms. Schaap <br /> commented that the shingles on the house roof were slightly darker than the roof <br />proposed for the garage. <br /> <br />Councilmember McClung <br /> questioned when the homeowners were proposing to update the <br />home. <br /> <br /> <br />Scott Barsness <br />, Otagawa-Anschel Design Build, LLC, stated that the homeowners were hoping to <br />update the exterior façade of the house in the near future. <br /> <br />Councilmember Holmes <br /> requested further information on the variances requested. <br /> <br />City Planner Streff <br /> indicated that the homeowner was requesting to have a four foot overhang on <br />the northern façade. He commented that the second variance was being requested to allow <br />flexibility within the setback regulations in order to allow for the construction of an overhang to <br />encroach into the 40 foot front yard setback. He explained that the entire structure was within the <br />40 foot setback. <br /> <br />Councilmember Holden <br /> was in favor of the overhang, but was not in favor of the two different <br />colored roofs. <br /> <br />MOTION: Councilmember McClung moved and Councilmember Holmes seconded a <br />motion to approve Planning Case #13-020 for two (2) variances to allow the <br />proposed construction project located at 3324 Lake Johanna Boulevard, <br />based on the findings of fact and the submitted plans as amended by the four <br />(4) conditions in the January 13, 2014, report to the City Council. <br /> <br />1) The first variance is being requested in order to expand and alter the roof <br />design of a non-conforming accessory structure. <br /> <br />2) The second variance is being requested to allow flexibility of the setback <br />regulations in order to allow the construction of an overhang to encroach <br />into the 40-foot front yard setback. <br /> <br />The motion carried (5-0). <br /> <br /> B. Planning Case 13-021 PUD Amendment and Site Plan Review Boston <br />Scientific <br /> <br />Associate Planner Bachler <br /> stated that Boston Scientific is requesting a Master PUD Amendment <br />and Site Plan Review to construct a 1,310 square foot addition on the west side of Building 14, <br />which is located in the northwest quadrant of the Boston Scientific Campus. Building 14 is also <br />identified on the campus Master Plan as Building N. The purpose of the addition is to house <br />mechanical equipment used for manufacturing. <br /> <br />Associate Planner Bachler <br /> indicated that specific pieces of equipment that would be located in <br />the addition would include three air compressors, two air dryers, two vacuum pumps, one <br />compressed air storage tank, and one vacuum storage tank. Upon completion of the addition, <br />