My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
03-10-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 2:16:31 PM
Creation date
3/7/2014 2:26:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Draft feasibility report assessment approximately $20,000 <br />• Xcel option with standard Coloniallights; approximate assessment $5,700 <br />• Xcel option with more decorative Vernon lights; approximate assessment $9,100 <br />2. Davidson (E Street Flats site) <br />• Draft feasibility report assessment approximately $84,100 <br />• Xcel option with standard Coloniallights; approximate assessment $24,500 <br />• Xcel option with more decorative Vernon lights; approximate assessment $38,500 <br />3. Wells Fargo <br />• Draft feasibility report assessment approximately $14,600 <br />• Xcel option with standard Colonial lights; approximate assessment $4,400 <br />• Xcel option with more decorative Vernon lights; approximate assessment $6,800 <br />Another way to look at this would be the assessment rate per front foot for '�ust the lighting <br />component of the project. The rates for the three options would be approximately: <br />• Draft feasibiliry report <br />• Xcel standard option <br />• Xcel decorative option <br />$69.00 per front foot <br />$10.50 per front foot <br />$24.25 per front foot <br />Please review the information previously sent by email which has much more information about <br />the Xcel options. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.