My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-14-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
03-10-14-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 2:16:31 PM
Creation date
3/7/2014 2:26:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel EnergySM <br />OUTDOOR LIGHTING <br />November 25, 2013 <br />City of Arden Hills <br />Attn: Terry Maurer <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Dear Mr. Terry Maurer: <br />825 Rice Street <br />St. Paul, MN 55117 <br />Xcel Energy Outdoor Lighting is pleased to have an opportunity to submit an estimate for the City of Arden <br />Hilis street light project. Our goal is to provide you with the necessary information to assist you in your <br />decision making process. We are confident we can provide you with a comprehensive package that will <br />meet all your needs. <br />Please find below styles of product and the estimated project costs. This estimate includes all underground <br />facilities installed using the plowing or boring method for conduit antl wire antl the installation of each of the <br />following material. <br />Countv Road E W(Connelly to Lexington) Street Liqht Proiect: <br />1. The Pre-Pay Option upfront installation cost is -$86,678.80. <br />The monthly pre-pay option rate (A30) 100W High Pressure Sodium per luminaire is -$6.23. <br />lnstal! 20-100W Colonial Fixtures on 18' direct buried fiberglass poles. <br />Insta{I by plow approx 4200' of #6 AL wires in 1'/z" conduit, This is an estimate with 100' <br />spacing and alternating sides north and south. The existing customer owned streetlights <br />are to be remove� by the City of Arden Wi�fs ar� is not part of this estimat2. <br />2. The Pre-Pay Option upfront installation cost is -$201,903.00. <br />The monthly pre-pay option rate (A30) 100W High Pressure Sotlium per luminaire is -$6.23. <br />Install 20-100W Vernon Fixtures on 15' Washington fluted base mounted fiberglass poles. <br />Install by plow approx 4200' of #6 AL wires in 1'/�" conduit. This is an estimate with 100' <br />spacing and alternating sides north and south. The existing customer owned streetlights <br />are to be removed by the City of Arden Hills and is not part of this estimate. <br />Included in the monthly street light rate is full maintenance of the street light system. Maintenance of the <br />street light system covers the pole, fixture, conduit and wiring, as well as facilitation of any locating and <br />damage administration. Operations and Maintenance for the proposed street light system will be for 25 <br />years from the date of installation. <br />Xcel Energy Outdoor Lighting is very excited to partner with the City of Arden Hills for all your lighting needs. <br />If you have any questions regarding the proposal, please feel free to contact me at 651.229.2255. <br />Sincerely, <br />Angela Adesoro <br />Project Coordinator, Xcel Energy <br />
The URL can be used to link to this page
Your browser does not support the video tag.