Laserfiche WebLink
It will take between two and four weeks for the equipment to be ordered and installed so the <br />upgrade should be available for the 2014 jetting/televising season. <br />Attachment A: Copy of the CIP Item <br />Attachment B: Quote from Flexible Pipe Tool Company <br />Page of <br />