My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-14-TCAAP WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
04-14-14-TCAAP WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 2:37:49 PM
Creation date
4/11/2014 2:37:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aid Standards (CSAH) for intersection spacing which is ¼ mile minimum spacing for full access <br />1 <br />intersections and/ minimum spacing for right-in/right-out accesses. The minor streets will primarily <br />8 <br />provide access to residences and private businesses accesses. As the site development is refined, <br />the roadway system will be modified to provide access, sustaining access spacing requirements <br />result in reasonable mobility. <br />Local and Regional Roadway System Connections <br />The transportation network analysis for the surrounding system has been analyzed for the following <br />conditions: <br />1) Existing <br />Figure T4 <br />The existing roadway geometry is shown on. This scenario considers the following: <br /> Existing traffic <br /> Existing roadway geometry including the recently completed construction of the TH 10/CSAH <br />96 interchange completed in 2013. <br />2) 2030 No Build <br />Figure T5 <br />The 2030 No Build roadway geometry is shown on. <br /> 2030 background traffic <br /> 2030 roadway geometry that include programmed improvements. The only difference <br />between existing and 2030 is the addition of Highway Safety Improvement Program (HSIP) <br />funded improvements at the intersection of TH10 at County Road H. The changes include <br />modifying the current shared westbound through/left turn lane into an exclusive westbound <br />through lane, and an exclusive westbound left turn lane and traffic signal phase <br />modifications. <br />3) 2030 Baseline for the Minimum Development Scenario <br />Figure T6 <br />The 2030 Baseline geometry is shown on. The following infrastructure improvements <br />are included: <br /> Improvements described above for the 2030 No Build Scenario <br /> CR 96 and I-35W area improvements: <br /> Construct traffic signals at the: <br />o <br /> CR 96/Old Highway 8 and <br /> I-35W Interchange ramp terminals intersections. <br /> Provide two eastbound and two westbound through lanes between Old Highway 8 <br />o <br />and Round Lake Boulevard <br /> Provide two eastbound and westbound left turn lanes to access I-35W <br />o <br /> Old Highway 8 at CR 96 Intersection: <br />o <br /> Replace shared northbound through / right turn lane with one exclusive <br />northbound through lane and one exclusive northbound right turn lane <br /> Replace shared southbound through / left turn lane with one exclusive <br />southbound through lane and one exclusive southbound left turn lane <br />Figure T3 <br /> CR H and I35W interchange improvements shown in <br /> CR 10 and CR H improvements (double left WB to SB) <br /> Provide dual left turn lanes for these movements: <br />o <br /> Westbound <br /> Northbound <br /> Southbound <br /> Provide a second through lane for eastbound and westbound approaches <br />o <br /> Improve CR H at I-35W northbound ramps to a 2-lane roundabout with two approach lanes <br />from the east and west, and one approach lane from the northeast and one entry lane to <br />northbound I-35W. <br />TCAAP Traffic Analysis <br />Technical Memorandum6March 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.