Laserfiche WebLink
According to the applicant, the waste materials that are produced by their manufacturing process <br />are stored onsite and then collectedand transported off-site for recycling. <br />There are currently four(4)similar storage tanks and two (2) silos on the property that were <br />installedfollowing the approval of threeprevious PUD Amendments.The existingstoragetanks <br />are used for housing new and recycled solvent along with waste ink and solvent that is produced <br />during themanufacturing process. The two (2) silos are used for storing plastic resin pelletsthat <br />are used for the extrusion laminator.This request would add one (1) additional storagetank to <br />thesoutheastern side of the property.The proposed storage tank would be located adjacent to <br />the existing storage tanks and within the current screening fence. The storage tankwould be <br />placed horizontallybehind the existing tanks and approximately seven (7) feet from the external <br />wall of the building. <br />According to the applicant, the MPCA (Attachment D) requires that the tanks on the property be <br />doublewalled and placed within a containment areaon the exterior of the building. The <br />containment area in the event of an accidentis requiredin order to hold the contents of the <br />largest storage tank. The applicant currently has a containment curbing system in place that has <br />the ability to hold one-hundred (100) percent of the contents of the largest tank on site. The <br />applicants have a valid license with Ramsey County for handling hazardous materials (waste ink <br />and solvent) that areproduced. Hazardous waste materials can be handled in the GB Zoning <br />District with the proper licenses from the Ramsey County Public Health Department. <br />The applicant has submitted anarrativeof theproject, a site planof the property,and the details <br />of the storage tank. (AttachmentA& B) <br />2.Previous Planning Cases <br />The property has been part offivepreviousplanning cases. In 1997, the original PUD was <br />approved inPlanning Case 97-006.PUD Amendments in Planning Cases 00-017 and 00-031 <br />were approved in 2000, forminor changes to the exterior of the building and to add storage tanks <br />on the southeastside of the building.In 2007,a PUD Amendment was approved in Planning <br />Case 07-013thatallowedthe installation of two additional storage tankswithin the previously <br />approved screening area.Planning Case 11-019 was approved by a PUD Amendment in 2011 <br />andallowedthe installation oftwo storage silos and one containment tank. <br />3.Site Data: <br />Future Land Use Plan:Light Industrial and Office <br />Existing Land Use:Light Industrial (office space, manufacturing, and warehousing) <br />Zoning:G-B: Gateway Business <br />Lot Size:8.93 Acres (388,991sf) <br />City of Arden Hills <br />Planning Commission Meeting for April 9, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-012 -Hood Packaging -PUD Amendment\Memos_Reports_14-012 <br />Page 2of 7 <br />