My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-14 Special WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2014
>
05-27-14 Special WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 10:47:57 AM
Creation date
5/21/2014 9:29:45 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION—MAY 27, 2014 2 <br /> Councilmember Holden requested information about the current capacity of the bridge and asked <br /> if this would change after the interchange work was complete. <br /> Ms. Engum explained that the bridge was three lanes at this time and the future bridge would be <br /> five lanes wide. <br /> Discussion ensued regarding how traffic would flow through the interchange and over the bridge. <br /> Mayor Grant questioned where the new bridge would be built. <br /> Ms. Engum reported that the new bridge would be built next to the old bridge, similar to the Rice <br /> Street/Highway 36 bridge replacement. This would allow the old bridge to remain in service as <br /> long as possible. She commented that the alignment would be altered slightly once the new <br /> bridge was completed. She indicated that final design plans and staging for the bridge would be <br /> completed later this summer. <br /> Councilmember Holden questioned if this intersection would be able to handle future traffic <br /> levels after TCAAP and the Northwest Quadrant was fully developed. <br /> Ms. Engum stated that the diverging diamond would operate better than a standard diamond at <br /> full build-out based on the regional model. <br /> Mayor Grant suggested that the bridge be made wide enough in the event that I-35W is widened <br /> in the future. He asked how the bridge and interchange improvements would be funded. <br /> Ms. Engum indicated that the County received $29 million in funding from the State and $12 <br /> million from this allocation would be set aside for this interchange. She commented that MnDOT <br /> would be contributing another$2.5 million plus $250,000 for signals. <br /> Mayor Grant questioned the total expense for this project. <br /> Ms. Engum estimated that the project will cost between$14 and 16 million. <br /> Councilmember Holmes requested further information on the trail and sidewalk widths to be <br /> provided by the County. She questioned if it was necessary to have both a sidewalk and trail over <br /> the bridge. <br /> Ms. Engum stated that MnDOT would fund one crossing across the bridges. She reported that <br /> she did not have all of the information on the sidewalk or trail but would bring this information to <br /> the Council when the plans were closer to the final design phase. She indicated that the expense <br /> for the sidewalk would be split between the cities of Arden Hills and New Brighton, and MnDOT <br /> would pay for the trail. She reported that the County was committed to having both connections. <br /> She noted that a good faith estimate would come to the City on June 30th when the City is <br /> requested to provide municipal consent. The estimate will provide the Council with a better idea <br /> of the City's cost participation. <br /> Mayor Grant inquired how traffic would flow through the City when the bridge is closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.