My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-14 Special WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2014
>
05-27-14 Special WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 10:47:57 AM
Creation date
5/21/2014 9:29:45 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION—MAY 27, 2014 3 <br /> Ms. Engum reviewed the proposed detour with the Council noting that traffic will be routed to I- <br /> 694 via Lexington Avenue. <br /> • Coordination of Three Bridge Projects in 2015 <br /> Beth Engum, Ramsey County, noted that County Road H at I-35W is a 2016 project. She <br /> reviewed a map for the 2015-2016 county projects that showed how traffic will be impacted. She <br /> reported that the bridge closures will be coordinated in a manner to ensure they do not overlap. <br /> Councilmember Holden expressed concern with how Arden Hills' residents would be impacted <br /> by the numerous bridge closings. She recommended that the 1-35W bridge closing be postponed <br /> to lessen the impact on residents. <br /> Ms. Engum stated that it could be written into the contract, however, the County wanted to have <br /> this project completed in one construction season. <br /> Councilmember McClung feared that the I-35W/County Road 96 project may not go as <br /> smoothly as planned and then the City would be facing another Highway 10/County Road 96 <br /> delayed construction situation given the unpredictability of the weather. <br /> Mayor Grant asked how long the County Road E bridge over Snelling would be out of service. <br /> Ms. Engum explained that there is no room for realignment with this bridge so it would be closed <br /> for approximately four months as it is reconstructed. <br /> Kent Barnard, MnDOT, anticipated that the County Road E bridge would be constructed <br /> between April through November of 2015. He reported that this contract would be incentivized to <br /> encourage the contractor to complete the project on time or early. He explained that the County <br /> Road F at 1-35W bridge would be replaced at the end of the 2015 school year (April to August) or <br /> end of the 2016 school year(April to August). <br /> Councilmember Holden questioned why the County and MnDOT were proposing to work on the <br /> County Road E and County Road F bridges in the same construction season. <br /> Mr. Barnard reported that the ramps would not be closed for the entire duration of the project. <br /> Ms. Engum stated that MnDOT has these two bridges, along with County Road E2, programmed <br /> for replacement in 2015 due to the conditions of the bridges. She commented that bridge <br /> replacements impact traffic much less than full road reconstruction. <br /> Councilmember Holden asked if the County Road E2 bridge would be a full closure. <br /> Ms. Engum stated that this was the case as the alignment could not shift. <br /> Mayor Grant thanked Ms. Engum and Mr. Barnard for the information they provided to Council <br /> this evening. <br />
The URL can be used to link to this page
Your browser does not support the video tag.