Laserfiche WebLink
screened from the south by a wooded wetland area located between the building and County <br />Road F. One additional tree planting is proposed in order to meet the <br />requirements, which would be added on the east side of Innovation Way near the Cumming Park <br />Drive turnaround. <br /> <br /> <br />Boston Scientific Master Plan <br /> <br />The campus Master Plan was originally approved in 2002. A total of 419,500 square feet of <br />building space was proposed for Phase 1, which was scheduled to be completed in 2006. Due to <br />the change in ownership from Guidant to Boston Scientific in 2006, as well as other market <br />conditions, portions of Phase 1 have not been constructed. Two new buildings (L and K) and an <br />addition to Building I were expected to be finished during Phase I. Of this additional building <br />area, only Building L and the Building I addition have been built. Plans for Building K have not <br />yet been submitted. The Master Plan requires a traffic study be completed at the end of Phase 1. <br /> <br />The Building J addition (90,000 square feet) was moved from Phase 2 to Phase 1 (PC 04-01); <br />however, this addition has not been constructed. Three additions to Building N (14) were also <br />approved for Phase 1 (PC 03-024, PC 06-033, and PC 13-021), which has added 40,250 square <br />feet to the campus to date. The 1,310 square foot addition to Building N (14) approved by the <br />City Council in PC 13-021 will be constructed in the summer of 2014. <br /> <br />Since the Master Plan was approved in 2002, the City has approved 297,560 square feet of new <br />space, of which 206,250 square feet have been constructed. <br /> <br />Master Plan - Approved <br /> <br />Planning CaseBuildingPhase 1 (s.f.)Size (s.f.)Built (s.f.) <br /> <br />PC 03-06 L108,000112,000Yes <br /> <br />PC 03-07 I52,30054,000Yes <br /> <br />Not yet submittedK259,2000No <br /> <br />Original Phase 1 Subtotal 419,500166,000166,000 <br /> <br />PC 13-21N (14)1,3101,310No <br /> <br />PC 06-33N (14) 2,2502,250Yes <br /> <br />PC 04-01 J80,00090,000No <br /> <br />PC 03-24N (14) 38,00038,000Yes <br /> <br />Amended Phase 1 Subtotal 121,560131,56040,250 <br /> <br />Phase 1 Original and Amended Total541,060297,560206,250 <br /> <br />Proposed Addition (PC 14-15)D (10)730730Proposed <br /> <br />Final Total 541,790298,290206,250 <br /> <br />City of Arden Hills <br />City Council Meeting for May 27, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-015 - Boston Scientific - PUD Amendment - Building Addition\Memos and <br />Reports_14-015 <br />Page 2 of 4 <br /> <br />