Laserfiche WebLink
th <br />Master Plan PUD 82,250 square foot addition <br />06-03311/27/06 (Approved) <br />Amendmentto Building N(14) <br />th <br />Master Plan PUD 710,225 square foot addition 08/28/06 (Approved) <br />06-024 <br />Amendmentto Building N(14)Expired <br />th <br />Master Plan PUD 6 <br />06-010 <br />Parking Modifications04/24/06 (Approved) <br />Amendment <br />Installation of nitrogen <br />th <br />Master Plan PUD 5 <br />04-018generator, vaporizers, and 10/25/04 (Approved) <br />Amendment <br />50-foot tall storage tank <br />th <br />Master Plan PUD 4 <br />04-017Parking Modifications07/12/04 (Approved) <br />Amendment <br />Satellite antennae for <br />04-013Special Use Permit <br />07/12/04 (Approved) <br />Building L <br />04-004Site Plan ReviewTemporary Walkway02/23/04 (Approved) <br />rd <br />Master Plan PUD 3Moving Addition J from <br />04-001Amendment and Final Phase 2 to Phase 1 and 02/23/04 (Approved) <br />PUDslightly larger Addition J <br />nd <br />Master Plan PUD 2Site layout change to allow <br />03-02509/29/03 (Approved) <br />Amendmentfor Building N Addition <br />03-024Site Plan ReviewBuilding N Addition09/29/03 (Approved) <br />03-023Site Plan ReviewParking Ramp #109/29/03 (Approved) <br />03-007Site Plan ReviewBuilding Addition I03/31/03 (Approved) <br />03-006Site Plan ReviewBuilding L03/31/03 (Approved) <br />st <br />Master Plan PUD 1Site layout changes to <br />03-00503/31/03 (Approved) <br />AmendmentBuildings I, K, L, and M <br />03-004Final PlatFinal Plat and Vacation06/30/03 (Approved) <br />Master Plan PUD, Guidant 3-phase Master <br />02-02511/12/02 (Approved) <br />Preliminary PlatPlan and Preliminary Plat <br />Lexington Avenue and <br />01-025Sign Variances <br />09/24/01 (Approved) <br />Water Tower Signage <br />5.Boston ScientificMaster Plan <br />The campus Master Plan was originally approved in 2002. A total of 419,500 square feet of <br />building space was proposed for Phase 1, which was scheduled to be completed in 2006. Due to <br />the change in ownership from Guidant to Boston Scientific in 2006, as well as other market <br />conditions, portions of Phase 1 have not been constructed. Two new buildings (L and K) and an <br />City of Arden Hills <br />Planning Commission Meeting for May 7, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-015 -Boston Scientific -PUD Amendment -Building Addition\Memos and <br />Reports_14-015 <br />Page 3of 9 <br />