Laserfiche WebLink
addition to Building I were expected to be finished during Phase I. Of this additional building <br />area, only Building L and the Building I addition have been built. Plans for Building K have not <br />yet been submitted. The Master Plan requires a traffic study be completed at the end of Phase 1. <br />The Building J addition (90,000 square feet) was moved from Phase 2 to Phase 1 (PC 04-01); <br />however,this addition has not been constructed. Threeadditionsto Building N (14) were also <br />approved for Phase 1(PC 03-024,PC 06-033, and PC 13-021), whichhas added 40,250square <br />feet to the campusto date.The 1,310 square foot addition to Building N (14) approved by the <br />City Council in PC 13-021 will be constructed in the summerof 2014. <br />Since the Master Plan was approved in2002, the City has approved 297,560square feet of new <br />space,of which 206,250 square feet have been constructed. As noted above, Phase 1 originally <br />proposed 419,500 square feet of new space. <br />Master Plan-Approved <br />Planning CaseBuildingPhase 1 (s.f.)Size (s.f.)Built (s.f.) <br />PC 03-06L108,000112,000Yes <br />PC 03-07I52,30054,000Yes <br />Not yet submittedK259,2000No <br />Original Phase 1Subtotal419,500166,000166,000 <br />PC 13-21N (14)1,3101,310No <br />PC 06-33N (14) 2,2502,250Yes <br />PC 04-01J80,00090,000No <br />PC 03-24N(14) 38,00038,000Yes <br />Amended Phase 1 Subtotal121,560131,56040,250 <br />Phase 1 –Original and Amended Total541,060297,560206,250 <br />Proposed Addition (PC 14-15)D (10)730730Proposed <br />Final Total541,790298,290206,250 <br />Plan Review <br />1.Zoning – <br />Meets Requirement <br />The Boston Scientific campus is located in the I-1: Limited Industrial Zoning District. The <br />approved Master Plan PUD for the propertyacts as an additional governing documentfor the <br />campus. The proposed addition would meet the requirements of the underlying zoning district as <br />well as the Master Plan. The proposed construction would fill in an open courtyard space and <br />City of Arden Hills <br />Planning Commission Meeting for May 7, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-015 -Boston Scientific -PUD Amendment -Building Addition\Memos and <br />Reports_14-015 <br />Page 4of 9 <br />