My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
81-071
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
1980-1989
>
1981
>
81-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:31:38 AM
Creation date
5/27/2014 1:41:13 PM
Metadata
Fields
Template:
General
Document
Resolution 81-71
General - Type
Resolution 81-71
Category
Resolution 81-71
Date
10/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_.;__ _ _. _ _. _ _. <br />STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />CITY OF ARDEN AILLS <br />RESOLUTION No. 81-71 <br />r <br />� <br />RESOLUTION AUTHORIZING SANITARY SEWER CONNECTION TO <br />THE NEW BRIGHTON SANITARY SEWER SYSTEM <br />WHEREAS, the trunk sanitary sewer system of the City of <br />Arden Hills (the "City") between Interstate Highway No. 694 and <br />the south corporate limits of the City (i.e., District W) has <br />been determined in the Arden Hills Comprehensive Sewer Policy <br />Plan ("CSPP") to be inadequate, and <br />WHEREAS, such inadequacy.in that portion of the City's <br />trunk sanitary sewer system which runs through District W is <br />because of sewage flows from District NC as indicated in the <br />CSPP, and <br />WHEREAS, sewage flows from District NC are pumped three <br />(3) times in the City before reaching the Metropolitan inter- <br />ceptor in Roseville, and <br />WHEREAS, the developable area of District NC is approxi- <br />mately 1,100 acres, the ultimate average daily flow through <br />District NC is estimated to be 0.793 M.G.D. (i.e., 793,000 <br />gallons per day), and the estimated peak flow is 4.1 cubic feet <br />per second, (��ed on a 3.3 peak flow factor), and <br />WHEREAS, the projected flows from District NC are as <br />follows: <br />Year <br />1980 <br />1985 <br />1990 <br />Population <br />Equivalent Average Flow M.G.D. <br />2844 0.284 <br />5033 0.503 <br />5749 0.575 <br />Peak Flow C.F.S. <br />1.58 <br />2.80 <br />3.20, and <br />WHEREAS, it is anticipated that trunk sanitary sewer <br />capacities in District W will have to be increased by 1984 if <br />District NC continues to flow into District W, and <br />WHEREAS, a gravity sanitary sewer diverting sewage flows <br />from District NC to New Brighton would eliminate the need for <br />.�� Sewer Pumping Station No. 10 in the City and the need for further <br />' pumping of sewage from District W, resulting in a saving of <br />electrical energy and other operation and maintenance costs, and <br />� �, <br />WHEREAS, in the City's report entitled "Proposed New <br />Brighton Sanitary Sewer Connection", dated August 18, 1981, a <br />copy of which is attached hereto, it was shown that Plan B--the <br />plan therein which propased the construction of a gravity sewer <br />to New Brighton--provided a long-term savings to the City of <br />approximately $325,000.00, and <br />WHEREAS, the City's Council approved Plan B at its meeting <br />on August 3T, 1981, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.